Expert systems for environmental self-assessment, a case study of Manitoba hydro sub-transmission lines, 66kv, in the rural municipality of Whitemouth
According to the Manitoba Environment Act, Classes of Development Regulation 164/88, the construction of transmission lines of less than 115 kV capacity does not require a formal environmental assessment. However, Manitoba Hydro voluntarily assesses the biophysical and socio-economic impacts of sub...
Main Author: | Hood, James W. |
---|---|
Language: | en_US |
Published: |
2007
|
Online Access: | http://hdl.handle.net/1993/840 |
Similar Items
-
Expert systems for environmental self-assessment, a case study of Manitoba hydro sub-transmission lines, 66kv, in the rural municipality of Whitemouth
by: Hood, James W.
Published: (2007) -
Expert systems for environmental self-assessment, a case study of Manitoba hydro sub-transmission lines, 66kv, in the rural municipality of Whitemouth
by: Hood, James W.
Published: (2007) -
Regional geography of the Whitemouth Valley, Manitoba
by: Lovering, James Herbert
Published: (2012) -
Regional geography of the Whitemouth Valley, Manitoba
by: Lovering, James Herbert
Published: (2012) -
Lightning performance improvement of the Swaziland Electricity Board transmission system (66kV & 132kV lines)
by: Mswane, Luke Mdumiseni
Published: (2014)