Capacity planning under fuzzy environment using possibilistic approach
Currently, capacity planning is receiving more emphasis in management of operations in Industrial Engineering because insufficient capacity may lead to deteriorating delivery performance and high work-in-process inventories. On the other hand excess capacity may lead to wastage of resources. Even th...
Main Author: | Bassan, Gurmail S. |
---|---|
Other Authors: | Balakrishnan, S. (Mechanical and Manufacturing Eng.) Bector, C.R. (Business Adminstration) |
Language: | en_US |
Published: |
2010
|
Subjects: | |
Online Access: | http://hdl.handle.net/1993/3928 |
Similar Items
-
Capacity planning under fuzzy environment using possibilistic approach
by: Bassan, Gurmail S.
Published: (2010) -
Possibilistic Approach for Travel Time Reliability Evaluation
by: Rajesh S. Prabhu Gaonkar, et al.
Published: (2021-02-01) -
A POSSIBILISTIC APPROACH TO CALCULATING THE INTERNAL RATE OF RETURN FOR INVESTMENT PROJECTS WITH FUZZY CASH FLOWS
by: E. S. Volkova, et al.
Published: (2017-10-01) -
Connecting possibilistic prudence and optimal saving
by: Ana María Lucia Casademunt, et al.
Published: (2013-12-01) -
A possibilistic and probabilistic approach to precautionary saving
by: Georgescu Irina, et al.
Published: (2017-01-01)