Automated Site Data Acquisition for Effective Project Control
Tracking and control of construction projects depend primarily on the accuracy, frequency and time required to collect actual onsite data of construction operations that characterize the work progress. Earned Value Analysis (EVA) is being used for reporting work progress and for forecasting proje...
Main Author: | Montaser, Ali |
---|---|
Format: | Others |
Published: |
2013
|
Online Access: | http://spectrum.library.concordia.ca/978609/1/Montaser_PhD_S2014.pdf Montaser, Ali <http://spectrum.library.concordia.ca/view/creators/Montaser=3AAli=3A=3A.html> (2013) Automated Site Data Acquisition for Effective Project Control. PhD thesis, Concordia University. |
Similar Items
-
Automated data acquisition for tracking and control of construction projects
by: El-Omari, Samir
Published: (2008) -
Automated system for data acquisition and monitoring
by: Borza Sorin, et al.
Published: (2017-01-01) -
Automated Meteorological Data Acquisition System
by: Ohmae, Yoshitsugu
Published: (1976) -
AUTOMATION OF EXTENSOMETRIC DATA ACQUISITION AND ANALYSIS
by: LUCIANO GURGEL VALENTE
Published: (1999) -
Automated Testing System of LED using Supervisor Control and Data Acquisition
by: Jian-Yuan Huang, et al.
Published: (2006)