Key performance indicators to measure design performance in construction

The performance of the design activities for a construction project can have a significant impact on the overall performance and efficiency of the project. Design activities need to be monitored to measure performance of the design process. Performance indicators can be used in this process. The Ind...

Full description

Bibliographic Details
Main Author: Budawara, Nasma
Format: Others
Published: 2009
Online Access:http://spectrum.library.concordia.ca/976626/1/NR63350.pdf
Budawara, Nasma <http://spectrum.library.concordia.ca/view/creators/Budawara=3ANasma=3A=3A.html> (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University.
id ndltd-LACETR-oai-collectionscanada.gc.ca-QMG.976626
record_format oai_dc
spelling ndltd-LACETR-oai-collectionscanada.gc.ca-QMG.9766262013-10-22T03:48:14Z Key performance indicators to measure design performance in construction Budawara, Nasma The performance of the design activities for a construction project can have a significant impact on the overall performance and efficiency of the project. Design activities need to be monitored to measure performance of the design process. Performance indicators can be used in this process. The Indicators can: i) measure the degree of success of a project or organization; ii) predict, control and measure the performance of design processes; iii) benchmark performances of different projects within the same- company or with other firms; iv) track and demonstrate long-term development and improvement, thereby decreasing design and construction cost and time and increasing the quality of the design product. In the context of Canada, specific construction performance indicators to assess construction project performance across project phases have yet to be formulated and documented. Therefore, there is a need to develop such indicators for the Canadian consulting engineering. From this perspective, the present research introduces practical framework and describes a model that measure the performance of the design activities for Canadian construction projects. The main objectives of this research are the following: i) to identify key indicators that affect the design performance of construction projects; ii) to develop a model for Key Performance Indicators (KPIs) to measure the performance of design activities in the Canadian construction industry; and iii) to examine the possibility of their use in the construction industry. The methodology adopted for this research is based on review of the existing literature on design processes, review of the existing literature on design performance indicators, questionnaire surveys, interviews with practitioners, and case studies. The questionnaires along with the interviews with designers and managers from the Canadian consulting engineering are mainly conducted to explore and indentify indicators affecting the design performance. The case studies are used to validate and amend the use of these indicators in measuring project performance at the design stage. A web-based questionnaire aimed at design and construction firms was constructed. The significance and the quantification of design performance indicators are determined using a statistical package. The results from the questionnaire were used to develop a generic set of nine groups of design performance indicators for the Canadian consulting engineering. However, this research focuses on the heavy construction sector. The nine groups of indicators have been compared in pairs to identify their level of importance to each other. Experts from heavy construction participated in the pairwise comparisons task. Built on the results of the survey and experts judgment, a Model for Design Performance Measurement (MDPM) is introduced. The MDPM uses the standard Analytic Hierarchy Process (AHP) method to assign weights to the scores of the selected indicators, to measure a project performance and to compare projects. The MDPM is tested for small scale heavy constructions. The developed design performance measurement model can 1) predict, track, and control future performance, 2) highlight area/s for future improvement, 3) enable companies to benchmark the performance of different projects from the same or different companies, and 4) document all design performance data 2009 Thesis NonPeerReviewed application/pdf http://spectrum.library.concordia.ca/976626/1/NR63350.pdf Budawara, Nasma <http://spectrum.library.concordia.ca/view/creators/Budawara=3ANasma=3A=3A.html> (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University. http://spectrum.library.concordia.ca/976626/
collection NDLTD
format Others
sources NDLTD
description The performance of the design activities for a construction project can have a significant impact on the overall performance and efficiency of the project. Design activities need to be monitored to measure performance of the design process. Performance indicators can be used in this process. The Indicators can: i) measure the degree of success of a project or organization; ii) predict, control and measure the performance of design processes; iii) benchmark performances of different projects within the same- company or with other firms; iv) track and demonstrate long-term development and improvement, thereby decreasing design and construction cost and time and increasing the quality of the design product. In the context of Canada, specific construction performance indicators to assess construction project performance across project phases have yet to be formulated and documented. Therefore, there is a need to develop such indicators for the Canadian consulting engineering. From this perspective, the present research introduces practical framework and describes a model that measure the performance of the design activities for Canadian construction projects. The main objectives of this research are the following: i) to identify key indicators that affect the design performance of construction projects; ii) to develop a model for Key Performance Indicators (KPIs) to measure the performance of design activities in the Canadian construction industry; and iii) to examine the possibility of their use in the construction industry. The methodology adopted for this research is based on review of the existing literature on design processes, review of the existing literature on design performance indicators, questionnaire surveys, interviews with practitioners, and case studies. The questionnaires along with the interviews with designers and managers from the Canadian consulting engineering are mainly conducted to explore and indentify indicators affecting the design performance. The case studies are used to validate and amend the use of these indicators in measuring project performance at the design stage. A web-based questionnaire aimed at design and construction firms was constructed. The significance and the quantification of design performance indicators are determined using a statistical package. The results from the questionnaire were used to develop a generic set of nine groups of design performance indicators for the Canadian consulting engineering. However, this research focuses on the heavy construction sector. The nine groups of indicators have been compared in pairs to identify their level of importance to each other. Experts from heavy construction participated in the pairwise comparisons task. Built on the results of the survey and experts judgment, a Model for Design Performance Measurement (MDPM) is introduced. The MDPM uses the standard Analytic Hierarchy Process (AHP) method to assign weights to the scores of the selected indicators, to measure a project performance and to compare projects. The MDPM is tested for small scale heavy constructions. The developed design performance measurement model can 1) predict, track, and control future performance, 2) highlight area/s for future improvement, 3) enable companies to benchmark the performance of different projects from the same or different companies, and 4) document all design performance data
author Budawara, Nasma
spellingShingle Budawara, Nasma
Key performance indicators to measure design performance in construction
author_facet Budawara, Nasma
author_sort Budawara, Nasma
title Key performance indicators to measure design performance in construction
title_short Key performance indicators to measure design performance in construction
title_full Key performance indicators to measure design performance in construction
title_fullStr Key performance indicators to measure design performance in construction
title_full_unstemmed Key performance indicators to measure design performance in construction
title_sort key performance indicators to measure design performance in construction
publishDate 2009
url http://spectrum.library.concordia.ca/976626/1/NR63350.pdf
Budawara, Nasma <http://spectrum.library.concordia.ca/view/creators/Budawara=3ANasma=3A=3A.html> (2009) Key performance indicators to measure design performance in construction. PhD thesis, Concordia University.
work_keys_str_mv AT budawaranasma keyperformanceindicatorstomeasuredesignperformanceinconstruction
_version_ 1716608230539395072