Systematic Approach for Modifying Project Schedules due to Unexpected Changes
Project schedules are subject to change due to uncertain aspects, such as failure of machines, worker Absenteeism and turnovers, changes of scope, and reworks, etc. These changes may often result in project delays, cost overruns, quality defects and other negative impacts. In response to changes, pr...
Main Author: | Haque, S M Anamul |
---|---|
Format: | Others |
Published: |
2012
|
Online Access: | http://spectrum.library.concordia.ca/974979/4/Haque_MASc_S2013.pdf Haque, S M Anamul <http://spectrum.library.concordia.ca/view/creators/Haque=3AS_M_Anamul=3A=3A.html> (2012) Systematic Approach for Modifying Project Schedules due to Unexpected Changes. Masters thesis, Concordia University. |
Similar Items
-
Integrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability
by: Mehdi Iranpoor, et al.
Published: (2019-01-01) -
Systematic approach for developing as-built schedule for construction project
by: Zubair Ahmed Memon, et al.
Published: (2006) -
Unexpected difficult intubation due to subglottic ring
by: Abdulkadir Atım, et al.
Published: (2010-03-01) -
Differential Expression Analysis of Type II Toxin-Antitoxin Genes of Pseudomonas aeruginosa PAO1 under Different Environmental Conditions
by: Haque, Anamul
Published: (2018) -
Unexpected friction behaviours due to capillary and adhesion effects
by: Fei Guo, et al.
Published: (2017-03-01)