Integrated Forensic Delay Analysis Framework for Construction Projects –Time and Cost Perspectives
Claims resulting from delays and acceleration on construction projects are inevitable. To prepare a delay/acceleration claim, a forensic schedule analysis needs to be performed. In this analysis, the impacts of different delays/accelerations are assessed and the responsibility of each party is calcu...
Main Author: | |
---|---|
Format: | Others |
Published: |
2011
|
Online Access: | http://spectrum.library.concordia.ca/36214/1/Abu%2DOsbeh_PhD_S2012.pdf Abu-Osbeh, Muhanad <http://spectrum.library.concordia.ca/view/creators/Abu-Osbeh=3AMuhanad=3A=3A.html> (2011) Integrated Forensic Delay Analysis Framework for Construction Projects –Time and Cost Perspectives. PhD thesis, Concordia University. |
Internet
http://spectrum.library.concordia.ca/36214/1/Abu%2DOsbeh_PhD_S2012.pdfAbu-Osbeh, Muhanad <http://spectrum.library.concordia.ca/view/creators/Abu-Osbeh=3AMuhanad=3A=3A.html> (2011) Integrated Forensic Delay Analysis Framework for Construction Projects –Time and Cost Perspectives. PhD thesis, Concordia University.