Development and optimization of new generation start-up instrumentation systems (SUI) for domestic CANDU reactors
Due to the age and operating experience of Bruce Power units, equipment ageing and obsolescence has become one of the main challenges that need to be resolved for all systems, structures and components in order to ensure a safe and reliable production of energy. The research objectives of this thesi...
Main Author: | Nasimi, Elnara |
---|---|
Other Authors: | Gabbar, Hossam A. |
Language: | en |
Published: |
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/10155/129 |
Similar Items
-
DOCUMENTARY: HYPOSTASES OF THE SUSTAINABLE DEVELOPMENT
by: Florin Răzvan BĂLĂŞESCU
Published: (2013-03-01) -
Analysis of Liquid Zone Control Valve Oscillation Problem in CANDU Reactors
by: Elnara Nasimi, et al.
Published: (2013-01-01) -
Meningitis por Streptococcus suis en un paciente inmunocompetente Streptococcus suis meningitis in an immunocompetent patient
by: A. Nagel, et al.
Published: (2008-09-01) -
Sui Adjective Modifiers
by: James N. Stanford
Published: (2014-01-01) -
Swine infection by Streptococcus suis: a retrospective study Infecção em suínos por Streptococcus suis: estudo retrospectivo
by: A.E. Del'Arco, et al.
Published: (2008-08-01)