Development and optimization of new generation start-up instrumentation systems (SUI) for domestic CANDU reactors

Due to the age and operating experience of Bruce Power units, equipment ageing and obsolescence has become one of the main challenges that need to be resolved for all systems, structures and components in order to ensure a safe and reliable production of energy. The research objectives of this thesi...

Full description

Bibliographic Details
Main Author: Nasimi, Elnara
Other Authors: Gabbar, Hossam A.
Language:en
Published: 2011
Subjects:
Online Access:http://hdl.handle.net/10155/129
id ndltd-LACETR-oai-collectionscanada.gc.ca-OOSHDU.10155-129
record_format oai_dc
spelling ndltd-LACETR-oai-collectionscanada.gc.ca-OOSHDU.10155-1292013-04-17T04:05:44ZDevelopment and optimization of new generation start-up instrumentation systems (SUI) for domestic CANDU reactorsNasimi, ElnaraSUI installationRemoval procedure deveopment and optimizationDue to the age and operating experience of Bruce Power units, equipment ageing and obsolescence has become one of the main challenges that need to be resolved for all systems, structures and components in order to ensure a safe and reliable production of energy. The research objectives of this thesis will focus on methodology for modernization of Start- Up Instrumentation (SUI), both in-core and Control Room equipment, using a new generation of detectors and cables in order to manage obsolescence. The main objective of this thesis is to develop a new systematic approach to SUI installation/replacement procedure development and optimization. Although some additional features, such as real-time data monitoring and storage/archiving solutions for SUI systems are also examined to take full advantage of today’s digital technology, the objective of this thesis does not include detailed parametrical studies of detector or system performance. Instead, a number of technological, operational and maintenance issues associated with Start-Up Instrumentation systems at Bruce Power will be identified in this project and a structured approach to developing a replacement/installation procedure that can be standardized and used across all of the domestic CANDU stations is proposed. Finally, benefits of Hierarchical Control Chart (HCC) methodology for all stages of plant life management, such as system design, development, operation and maintenance are demonstrated. Keywords: Task Breakdown and Analysis methodology, installation/removal procedure development and optimization, risk-based analysis and optimization, Hierarchical Control Chart (HCC) methodology for system maintenance and troubleshooting, Start-Up Instrumentation (SUI), Ion Chambers, Fission Chambers, proportional counters, Shutdown System 1 (SDS1), Shutdown System 2 (SDS2).UOITGabbar, Hossam A.2011-01-24T21:06:37Z2011-01-24T21:06:37Z2010-12-01Thesishttp://hdl.handle.net/10155/129en
collection NDLTD
language en
sources NDLTD
topic SUI installation
Removal procedure deveopment and optimization
spellingShingle SUI installation
Removal procedure deveopment and optimization
Nasimi, Elnara
Development and optimization of new generation start-up instrumentation systems (SUI) for domestic CANDU reactors
description Due to the age and operating experience of Bruce Power units, equipment ageing and obsolescence has become one of the main challenges that need to be resolved for all systems, structures and components in order to ensure a safe and reliable production of energy. The research objectives of this thesis will focus on methodology for modernization of Start- Up Instrumentation (SUI), both in-core and Control Room equipment, using a new generation of detectors and cables in order to manage obsolescence. The main objective of this thesis is to develop a new systematic approach to SUI installation/replacement procedure development and optimization. Although some additional features, such as real-time data monitoring and storage/archiving solutions for SUI systems are also examined to take full advantage of today’s digital technology, the objective of this thesis does not include detailed parametrical studies of detector or system performance. Instead, a number of technological, operational and maintenance issues associated with Start-Up Instrumentation systems at Bruce Power will be identified in this project and a structured approach to developing a replacement/installation procedure that can be standardized and used across all of the domestic CANDU stations is proposed. Finally, benefits of Hierarchical Control Chart (HCC) methodology for all stages of plant life management, such as system design, development, operation and maintenance are demonstrated. Keywords: Task Breakdown and Analysis methodology, installation/removal procedure development and optimization, risk-based analysis and optimization, Hierarchical Control Chart (HCC) methodology for system maintenance and troubleshooting, Start-Up Instrumentation (SUI), Ion Chambers, Fission Chambers, proportional counters, Shutdown System 1 (SDS1), Shutdown System 2 (SDS2). === UOIT
author2 Gabbar, Hossam A.
author_facet Gabbar, Hossam A.
Nasimi, Elnara
author Nasimi, Elnara
author_sort Nasimi, Elnara
title Development and optimization of new generation start-up instrumentation systems (SUI) for domestic CANDU reactors
title_short Development and optimization of new generation start-up instrumentation systems (SUI) for domestic CANDU reactors
title_full Development and optimization of new generation start-up instrumentation systems (SUI) for domestic CANDU reactors
title_fullStr Development and optimization of new generation start-up instrumentation systems (SUI) for domestic CANDU reactors
title_full_unstemmed Development and optimization of new generation start-up instrumentation systems (SUI) for domestic CANDU reactors
title_sort development and optimization of new generation start-up instrumentation systems (sui) for domestic candu reactors
publishDate 2011
url http://hdl.handle.net/10155/129
work_keys_str_mv AT nasimielnara developmentandoptimizationofnewgenerationstartupinstrumentationsystemssuifordomesticcandureactors
_version_ 1716580067126018048