INNOVATIVE HYBRID FRP/STEEL SPLICE DETAILS FOR MODULAR BRIDGE EXPANSION JOINTS

Bridge expansion joints are directly subjected to traffic load, and thus prone to premature fatigue failure. Replacement of components such as modular bridge expansion joints is typically done in a staggered schedule to minimize traffic blockage. Field splices are used to connect the successively in...

Full description

Bibliographic Details
Main Author: RAMESHNI, RAMIN
Other Authors: Queen's University (Kingston, Ont.). Theses (Queen's University (Kingston, Ont.))
Language:en
en
Published: 2011
Subjects:
FRP
Online Access:http://hdl.handle.net/1974/6896
id ndltd-LACETR-oai-collectionscanada.gc.ca-OKQ.1974-6896
record_format oai_dc
spelling ndltd-LACETR-oai-collectionscanada.gc.ca-OKQ.1974-68962013-12-20T03:40:29ZINNOVATIVE HYBRID FRP/STEEL SPLICE DETAILS FOR MODULAR BRIDGE EXPANSION JOINTSRAMESHNI, RAMINExpansion JointSteelFatigueBridgeAdhesiveBondSplice DetailFinite ElementFRPBridge expansion joints are directly subjected to traffic load, and thus prone to premature fatigue failure. Replacement of components such as modular bridge expansion joints is typically done in a staggered schedule to minimize traffic blockage. Field splices are used to connect the successively installed segments. These splices typically include a combination of field welding or bolting, and experience has shown that they often fail due to fatigue cracking. This thesis reports the investigation of hybrid FRP/steel splice details that avoid the use of field welding. Two configurations have been examined: A GFRP pultruded square tube section, adhesively bonded to the soffit of the spliced beam, consists the moment resisting component in one configuration, whereas the other takes advantage of two series of FRP plates for this purpose. Bolted steel plates splice the beam through web in both cases. The behaviour of these details has been studied extensively under vertical static loads. The effect of several parameters including bond length, FRP end shape, bond surface treatment, adhesive, etc. for each detail has been investigated. A three-dimensional, non-linear finite element model has been developed for each detail and validated using the experimental results. The bond strength of two adhesives was investigated experimentally using double shear lap splice tests. A new method is proposed to analyze the strength of the splice details. This method is based on the results obtained from shear lap splice tests and the verified finite element model developed for the splice detail. The finite element model could thus be used for further parametric studies. More experiments, however, are statistically required before using this model with confidence. The fatigue behaviour of one of the promising splice details has been investigated both experimentally and numerically. A special fatigue test set-up has been designed and used successfully for this purpose. Two fatigue tests to 1,000,000 cycles were run. One failed at 719, 347 cycles and the other survived 1,000,000 cycles. The predicted fatigue life as per the developed model was 871,840 cycles. More experiments are required to understand the fatigue behaviour of the splice detail under various stress ranges.Thesis (Ph.D, Civil Engineering) -- Queen's University, 2011-11-30 16:53:07.385Queen's University (Kingston, Ont.). Theses (Queen's University (Kingston, Ont.))2011-11-30 16:53:07.3852011-12-01T17:20:12Z2011-12-01T17:20:12Z2011-12-01Thesishttp://hdl.handle.net/1974/6896enenCanadian thesesThis publication is made available by the authority of the copyright owner solely for the purpose of private study and research and may not be copied or reproduced except as permitted by the copyright laws without written authority from the copyright owner.
collection NDLTD
language en
en
sources NDLTD
topic Expansion Joint
Steel
Fatigue
Bridge
Adhesive
Bond
Splice Detail
Finite Element
FRP
spellingShingle Expansion Joint
Steel
Fatigue
Bridge
Adhesive
Bond
Splice Detail
Finite Element
FRP
RAMESHNI, RAMIN
INNOVATIVE HYBRID FRP/STEEL SPLICE DETAILS FOR MODULAR BRIDGE EXPANSION JOINTS
description Bridge expansion joints are directly subjected to traffic load, and thus prone to premature fatigue failure. Replacement of components such as modular bridge expansion joints is typically done in a staggered schedule to minimize traffic blockage. Field splices are used to connect the successively installed segments. These splices typically include a combination of field welding or bolting, and experience has shown that they often fail due to fatigue cracking. This thesis reports the investigation of hybrid FRP/steel splice details that avoid the use of field welding. Two configurations have been examined: A GFRP pultruded square tube section, adhesively bonded to the soffit of the spliced beam, consists the moment resisting component in one configuration, whereas the other takes advantage of two series of FRP plates for this purpose. Bolted steel plates splice the beam through web in both cases. The behaviour of these details has been studied extensively under vertical static loads. The effect of several parameters including bond length, FRP end shape, bond surface treatment, adhesive, etc. for each detail has been investigated. A three-dimensional, non-linear finite element model has been developed for each detail and validated using the experimental results. The bond strength of two adhesives was investigated experimentally using double shear lap splice tests. A new method is proposed to analyze the strength of the splice details. This method is based on the results obtained from shear lap splice tests and the verified finite element model developed for the splice detail. The finite element model could thus be used for further parametric studies. More experiments, however, are statistically required before using this model with confidence. The fatigue behaviour of one of the promising splice details has been investigated both experimentally and numerically. A special fatigue test set-up has been designed and used successfully for this purpose. Two fatigue tests to 1,000,000 cycles were run. One failed at 719, 347 cycles and the other survived 1,000,000 cycles. The predicted fatigue life as per the developed model was 871,840 cycles. More experiments are required to understand the fatigue behaviour of the splice detail under various stress ranges. === Thesis (Ph.D, Civil Engineering) -- Queen's University, 2011-11-30 16:53:07.385
author2 Queen's University (Kingston, Ont.). Theses (Queen's University (Kingston, Ont.))
author_facet Queen's University (Kingston, Ont.). Theses (Queen's University (Kingston, Ont.))
RAMESHNI, RAMIN
author RAMESHNI, RAMIN
author_sort RAMESHNI, RAMIN
title INNOVATIVE HYBRID FRP/STEEL SPLICE DETAILS FOR MODULAR BRIDGE EXPANSION JOINTS
title_short INNOVATIVE HYBRID FRP/STEEL SPLICE DETAILS FOR MODULAR BRIDGE EXPANSION JOINTS
title_full INNOVATIVE HYBRID FRP/STEEL SPLICE DETAILS FOR MODULAR BRIDGE EXPANSION JOINTS
title_fullStr INNOVATIVE HYBRID FRP/STEEL SPLICE DETAILS FOR MODULAR BRIDGE EXPANSION JOINTS
title_full_unstemmed INNOVATIVE HYBRID FRP/STEEL SPLICE DETAILS FOR MODULAR BRIDGE EXPANSION JOINTS
title_sort innovative hybrid frp/steel splice details for modular bridge expansion joints
publishDate 2011
url http://hdl.handle.net/1974/6896
work_keys_str_mv AT rameshniramin innovativehybridfrpsteelsplicedetailsformodularbridgeexpansionjoints
_version_ 1716621366969499648