Two-dimensional modeling of the Red River Floodway
The flood protection works (Shellmouth Reservoir, Portage Diversion and the Red River Floodway) were designed to protect the City of Winnipeg from a flood event with a peak discharge of 169,000 cfs. The Red River Floodway is the component of the flood control works system with the greatest capacity...
Main Author: | |
---|---|
Language: | en_US |
Published: |
2007
|
Online Access: | http://hdl.handle.net/1993/1812 |
Search Result 1
Search Result 2