Brownfield site redevelopment planning, liability, risk assessment and risk management : a City of Winnipeg case study

Brownfields are abandoned, idle or under-utilized industrial and commercial lands where redevelopment is complicated by real or perceived contamination. They can perpetuate pockets of decay throughout the urban footprint. Along with negative physical impacts, they pose economic and environmental thr...

Full description

Bibliographic Details
Main Author: Brown, Victoria S. A.
Language:en_US
Published: 2007
Online Access:http://hdl.handle.net/1993/1447
id ndltd-LACETR-oai-collectionscanada.gc.ca-MWU.1993-1447
record_format oai_dc
spelling ndltd-LACETR-oai-collectionscanada.gc.ca-MWU.1993-14472014-03-29T03:41:21Z Brownfield site redevelopment planning, liability, risk assessment and risk management : a City of Winnipeg case study Brown, Victoria S. A. Brownfields are abandoned, idle or under-utilized industrial and commercial lands where redevelopment is complicated by real or perceived contamination. They can perpetuate pockets of decay throughout the urban footprint. Along with negative physical impacts, they pose economic and environmental threats, complicating their management and redevelopment. Canadian municipal planning departments have only recently begun to address a variety of brownfield planning issues. he City of Winnipeg, in particular, wants to better understand the liabilities it faces, as a brownfield site owner. Winnipeg was the subject city for this study of brownfield redevelopment planning issues. By literature review, interview and survey methods, a policy argument for brownfield redevelopment planning is presented. Environmental, economic and legal liabilities are defined. Lender liability and bank practices are reviewed. Environmental risk assessment and risk management issues are critiqued. Risk-ranking tools applicable to brownfield redevelopment planning are suggested. The review of Manitoba and Winnipeg policies and statutes, as well as reference to several Canadian brownfield cases, frames the program and procedural recommendations designed for the City of Winnipeg. (Abstract shortened by UMI.) 2007-05-17T12:36:46Z 2007-05-17T12:36:46Z 1998-08-01T00:00:00Z http://hdl.handle.net/1993/1447 en_US
collection NDLTD
language en_US
sources NDLTD
description Brownfields are abandoned, idle or under-utilized industrial and commercial lands where redevelopment is complicated by real or perceived contamination. They can perpetuate pockets of decay throughout the urban footprint. Along with negative physical impacts, they pose economic and environmental threats, complicating their management and redevelopment. Canadian municipal planning departments have only recently begun to address a variety of brownfield planning issues. he City of Winnipeg, in particular, wants to better understand the liabilities it faces, as a brownfield site owner. Winnipeg was the subject city for this study of brownfield redevelopment planning issues. By literature review, interview and survey methods, a policy argument for brownfield redevelopment planning is presented. Environmental, economic and legal liabilities are defined. Lender liability and bank practices are reviewed. Environmental risk assessment and risk management issues are critiqued. Risk-ranking tools applicable to brownfield redevelopment planning are suggested. The review of Manitoba and Winnipeg policies and statutes, as well as reference to several Canadian brownfield cases, frames the program and procedural recommendations designed for the City of Winnipeg. (Abstract shortened by UMI.)
author Brown, Victoria S. A.
spellingShingle Brown, Victoria S. A.
Brownfield site redevelopment planning, liability, risk assessment and risk management : a City of Winnipeg case study
author_facet Brown, Victoria S. A.
author_sort Brown, Victoria S. A.
title Brownfield site redevelopment planning, liability, risk assessment and risk management : a City of Winnipeg case study
title_short Brownfield site redevelopment planning, liability, risk assessment and risk management : a City of Winnipeg case study
title_full Brownfield site redevelopment planning, liability, risk assessment and risk management : a City of Winnipeg case study
title_fullStr Brownfield site redevelopment planning, liability, risk assessment and risk management : a City of Winnipeg case study
title_full_unstemmed Brownfield site redevelopment planning, liability, risk assessment and risk management : a City of Winnipeg case study
title_sort brownfield site redevelopment planning, liability, risk assessment and risk management : a city of winnipeg case study
publishDate 2007
url http://hdl.handle.net/1993/1447
work_keys_str_mv AT brownvictoriasa brownfieldsiteredevelopmentplanningliabilityriskassessmentandriskmanagementacityofwinnipegcasestudy
_version_ 1716657360875814912