Resloping of waste dumps : the Bullmoose solution
As a result of a review of rock dump reclamation in 2000, resloping of unreclaimed rock dumps from angle of repose to less than a 2:1 slope was adopted as the preferred method. As a result of the analysis and field trials, resloping was performed using two different methods, horizontal cut and incl...
Main Author: | Allen, M. G. |
---|---|
Language: | English |
Published: |
2009
|
Online Access: | http://hdl.handle.net/2429/9039 |
Similar Items
-
The reclamation process at Bullmoose Operating Corporation
by: Lacarte, Michael W.
Published: (2009) -
Resloping coal mine spoils at the Fording River Operations
by: Berdusco, Roger Joseph, et al.
Published: (2010) -
Constructed wetland : Bullmoose minesite, Tumbler Ridge, B.C.
by: Davies, G. W.
Published: (2009) -
Use of remote sensing in reclamation assessment at Teck Cominco’s Bullmoose mine site
by: Straker, Justin, et al.
Published: (2009) -
Mine waste dump instability
by: Moffitt, Karen
Published: (2009)