Developing and implementing industrial engineering methods for process improvement at Telus communications

TELUS, a large Canadian telecommunications company primarily based in Western Canada, provides a full range of telecommunications products and services including data, Internet protocol (IP), voice and mobile wireless services. Every month TELUS processes high volumes of customer orders either for n...

Full description

Bibliographic Details
Main Author: Mojica, Tomas
Language:English
Published: 2009
Online Access:http://hdl.handle.net/2429/15363
id ndltd-LACETR-oai-collectionscanada.gc.ca-BVAU.2429-15363
record_format oai_dc
spelling ndltd-LACETR-oai-collectionscanada.gc.ca-BVAU.2429-153632014-03-14T15:48:17Z Developing and implementing industrial engineering methods for process improvement at Telus communications Mojica, Tomas TELUS, a large Canadian telecommunications company primarily based in Western Canada, provides a full range of telecommunications products and services including data, Internet protocol (IP), voice and mobile wireless services. Every month TELUS processes high volumes of customer orders either for new service or changes in existing service. Within TELUS, the Assignment and Activation group processes all orders and is responsible for changes in the mainframe computers and switches as well as coordination with field service representatives that actually perform physical installations of and changes to customer equipment. The challenges faced by the order processing center include difficulty meeting current throughput and lead time requirements, as well as uncertainty regarding the metrics used for quality and process measurement. Further, increased competition in the telecommunications industry has pressured TELUS to cut costs, resulting a major workforce reduction and widespread process and service reorganization. This thesis describes the development and application of simulation to study the Assignment and Activation group. The data analysis and model development procedure is outlined and results are discussed. Although simulation model development was hindered by difficulties collecting process data, the model building and data analysis process helped identify several opportunities for improvement. The steps required to continue developing the simulation, therefore enabling more detailed questions about the process to be evaluated, are also outlined. Based on the simulation analysis it is recommended that better data collection be implemented to measure key metrics, especially processing time distributions. Putting the uncertainty in the confidence level of the processing estimates aside, this study found that improving the Auto Front End Assignable or the exception rates would have a negligible effect on throughput if the processing times are close to average. In addition, shifting the days out ahead by three days resulted in a 3% increase in on-time completions. Finally in most of the scenarios evaluated, the operator utilization appeared unrealistically high indicating a general staff shortage. 2009-11-20T01:31:57Z 2009-11-20T01:31:57Z 2004 2009-11-20T01:31:57Z 2004-05 Electronic Thesis or Dissertation http://hdl.handle.net/2429/15363 eng UBC Retrospective Theses Digitization Project [http://www.library.ubc.ca/archives/retro_theses/]
collection NDLTD
language English
sources NDLTD
description TELUS, a large Canadian telecommunications company primarily based in Western Canada, provides a full range of telecommunications products and services including data, Internet protocol (IP), voice and mobile wireless services. Every month TELUS processes high volumes of customer orders either for new service or changes in existing service. Within TELUS, the Assignment and Activation group processes all orders and is responsible for changes in the mainframe computers and switches as well as coordination with field service representatives that actually perform physical installations of and changes to customer equipment. The challenges faced by the order processing center include difficulty meeting current throughput and lead time requirements, as well as uncertainty regarding the metrics used for quality and process measurement. Further, increased competition in the telecommunications industry has pressured TELUS to cut costs, resulting a major workforce reduction and widespread process and service reorganization. This thesis describes the development and application of simulation to study the Assignment and Activation group. The data analysis and model development procedure is outlined and results are discussed. Although simulation model development was hindered by difficulties collecting process data, the model building and data analysis process helped identify several opportunities for improvement. The steps required to continue developing the simulation, therefore enabling more detailed questions about the process to be evaluated, are also outlined. Based on the simulation analysis it is recommended that better data collection be implemented to measure key metrics, especially processing time distributions. Putting the uncertainty in the confidence level of the processing estimates aside, this study found that improving the Auto Front End Assignable or the exception rates would have a negligible effect on throughput if the processing times are close to average. In addition, shifting the days out ahead by three days resulted in a 3% increase in on-time completions. Finally in most of the scenarios evaluated, the operator utilization appeared unrealistically high indicating a general staff shortage.
author Mojica, Tomas
spellingShingle Mojica, Tomas
Developing and implementing industrial engineering methods for process improvement at Telus communications
author_facet Mojica, Tomas
author_sort Mojica, Tomas
title Developing and implementing industrial engineering methods for process improvement at Telus communications
title_short Developing and implementing industrial engineering methods for process improvement at Telus communications
title_full Developing and implementing industrial engineering methods for process improvement at Telus communications
title_fullStr Developing and implementing industrial engineering methods for process improvement at Telus communications
title_full_unstemmed Developing and implementing industrial engineering methods for process improvement at Telus communications
title_sort developing and implementing industrial engineering methods for process improvement at telus communications
publishDate 2009