Nitrogen removal from coal mine wastewater using a pilot scale wetland : Year 1 results
The release of nutrients, especially nitrate from blasting operations, is a significant environmental concern within the operation of open pit coal mines. Cost effective techniques have not yet been identified for the removal of nitrate from large discharges such as surface coal mines. Bench scale...
Main Authors: | , , |
---|---|
Language: | English |
Published: |
2009
|
Online Access: | http://hdl.handle.net/2429/12687 |
id |
ndltd-LACETR-oai-collectionscanada.gc.ca-BVAU.2429-12687 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-LACETR-oai-collectionscanada.gc.ca-BVAU.2429-126872014-03-14T15:45:52Z Nitrogen removal from coal mine wastewater using a pilot scale wetland : Year 1 results Whitehead, Alan Joseph, 1952- Kelso, Bryan W. Malick, James G. The release of nutrients, especially nitrate from blasting operations, is a significant environmental concern within the operation of open pit coal mines. Cost effective techniques have not yet been identified for the removal of nitrate from large discharges such as surface coal mines. Bench scale laboratory studies for nitrate removal from coal mine wastes have shown promising results (Norecol 1987a, 1987b). As a result of these earlier studies, a 3 year pilot wetland study was commissioned to study plant nutrient removal efficiency, survival, and growth relative to wastewater characteristics, and wetland maintenance requirements. An operating coal mine on Vancouver Island in British Columbia was selected as the study site. This paper gives the results of the first year of operation from August to December 1988. The wetland system removed an average of 87% of the total nitrogen over this time period. There was a slight increase in ammonia due to productivity within the wetlands, which resulted in a net mass removal of 98.2% of NO₃-N from the waste water. Nitrate removal rates ranged from 0.251 g/m².d in August to 0.113 g/m².d in December. 2009-09-09T19:23:28Z 2009-09-09T19:23:28Z 1989 text http://hdl.handle.net/2429/12687 eng British Columbia Mine Reclamation Symposium 1989 British Columbia Technical and Research Committee on Reclamation |
collection |
NDLTD |
language |
English |
sources |
NDLTD |
description |
The release of nutrients, especially nitrate from blasting operations, is a significant environmental concern
within the operation of open pit coal mines. Cost effective techniques have not yet been identified for the
removal of nitrate from large discharges such as surface coal mines. Bench scale laboratory studies for
nitrate removal from coal mine wastes have shown promising results (Norecol 1987a, 1987b). As a result
of these earlier studies, a 3 year pilot wetland study was commissioned to study plant nutrient removal
efficiency, survival, and growth relative to wastewater characteristics, and wetland maintenance
requirements. An operating coal mine on Vancouver Island in British Columbia was selected as the study
site.
This paper gives the results of the first year of operation from August to December 1988. The wetland system
removed an average of 87% of the total nitrogen over this time period. There was a slight increase in ammonia
due to productivity within the wetlands, which resulted in a net mass removal of 98.2% of NO₃-N from the
waste water. Nitrate removal rates ranged from 0.251 g/m².d in August to 0.113 g/m².d in December. |
author |
Whitehead, Alan Joseph, 1952- Kelso, Bryan W. Malick, James G. |
spellingShingle |
Whitehead, Alan Joseph, 1952- Kelso, Bryan W. Malick, James G. Nitrogen removal from coal mine wastewater using a pilot scale wetland : Year 1 results |
author_facet |
Whitehead, Alan Joseph, 1952- Kelso, Bryan W. Malick, James G. |
author_sort |
Whitehead, Alan Joseph, 1952- |
title |
Nitrogen removal from coal mine wastewater using a pilot scale wetland : Year 1 results |
title_short |
Nitrogen removal from coal mine wastewater using a pilot scale wetland : Year 1 results |
title_full |
Nitrogen removal from coal mine wastewater using a pilot scale wetland : Year 1 results |
title_fullStr |
Nitrogen removal from coal mine wastewater using a pilot scale wetland : Year 1 results |
title_full_unstemmed |
Nitrogen removal from coal mine wastewater using a pilot scale wetland : Year 1 results |
title_sort |
nitrogen removal from coal mine wastewater using a pilot scale wetland : year 1 results |
publishDate |
2009 |
url |
http://hdl.handle.net/2429/12687 |
work_keys_str_mv |
AT whiteheadalanjoseph1952 nitrogenremovalfromcoalminewastewaterusingapilotscalewetlandyear1results AT kelsobryanw nitrogenremovalfromcoalminewastewaterusingapilotscalewetlandyear1results AT malickjamesg nitrogenremovalfromcoalminewastewaterusingapilotscalewetlandyear1results |
_version_ |
1716652553943384064 |