Fast-track approach to mining construction projects
Traditional mining engineering procedure can essentially be decomposed into three separate stages at the engineering level; the design phase; the construction phase; and finally the production and processing phase. The important characteristic of this procedure lies in the sequential manner in whi...
Main Author: | Bissiri, Yassiah |
---|---|
Language: | English |
Published: |
2009
|
Online Access: | http://hdl.handle.net/2429/10355 |
Similar Items
-
Fast-track approach to mining construction projects
by: Bissiri, Yassiah
Published: (2009) -
Application of agent-based modeling to truck-shovel dispatching systems in open pit mines
by: Bissiri, Yassiah
Published: (2009) -
Application of agent-based modeling to truck-shovel dispatching systems in open pit mines
by: Bissiri, Yassiah
Published: (2009) -
Fast-tracking of construction projects : analysis and assessment
by: Théberge, Pierre
Published: (1987) -
Investigation of Fast-Tracking Construction Projects and Unit-Price Contracts
by: 洪宏達
Published: (2008)