Fast-track approach to mining construction projects
Traditional mining engineering procedure can essentially be decomposed into three separate stages at the engineering level; the design phase; the construction phase; and finally the production and processing phase. The important characteristic of this procedure lies in the sequential manner in whi...
Main Author: | |
---|---|
Language: | English |
Published: |
2009
|
Online Access: | http://hdl.handle.net/2429/10355 |