Modeling the 3D net infiltration distribution at the Equity Silver Mine waste dump
The Equity Silver Mine site has been experiencing problems with ARD at its waste dump facility since 1981. A protective engineered soil cover was constructed over the top of the entire waste dump with the purpose of reducing ARD by impeding water and oxygen infiltration into the waste rock. Curren...
Main Author: | |
---|---|
Language: | English |
Published: |
University of British Columbia
2010
|
Online Access: | http://hdl.handle.net/2429/23635 |