Análise de indicadores de desempenho de empresas de construção civil na gestão de obras do Ifam no interior do estado do Amazonas.

Submitted by Alisson Mota (alisson.davidbeckam@gmail.com) on 2015-06-24T18:50:44Z No. of bitstreams: 1 Dissertação - Péricles Teixeira Veiga.pdf: 7686874 bytes, checksum: f3eedfcab0405ab726e82c6388f4eca6 (MD5) === Approved for entry into archive by Divisão de Documentação/BC Biblioteca Central (dd...

Full description

Bibliographic Details
Main Author: Veiga, Péricles Teixeira
Other Authors: Vasconcelos, Raimundo Pereira de
Format: Others
Language:Portuguese
Published: Universidade Federal do Amazonas 2015
Subjects:
Online Access:http://tede.ufam.edu.br/handle/tede/4198
Description
Summary:Submitted by Alisson Mota (alisson.davidbeckam@gmail.com) on 2015-06-24T18:50:44Z No. of bitstreams: 1 Dissertação - Péricles Teixeira Veiga.pdf: 7686874 bytes, checksum: f3eedfcab0405ab726e82c6388f4eca6 (MD5) === Approved for entry into archive by Divisão de Documentação/BC Biblioteca Central (ddbc@ufam.edu.br) on 2015-06-29T18:09:30Z (GMT) No. of bitstreams: 1 Dissertação - Péricles Teixeira Veiga.pdf: 7686874 bytes, checksum: f3eedfcab0405ab726e82c6388f4eca6 (MD5) === Approved for entry into archive by Divisão de Documentação/BC Biblioteca Central (ddbc@ufam.edu.br) on 2015-06-29T18:20:32Z (GMT) No. of bitstreams: 1 Dissertação - Péricles Teixeira Veiga.pdf: 7686874 bytes, checksum: f3eedfcab0405ab726e82c6388f4eca6 (MD5) === Made available in DSpace on 2015-06-29T18:20:32Z (GMT). No. of bitstreams: 1 Dissertação - Péricles Teixeira Veiga.pdf: 7686874 bytes, checksum: f3eedfcab0405ab726e82c6388f4eca6 (MD5) Previous issue date: 2013-08-09 === Não Informado. === Between the years 2008 to 2013, the federal government got a strategy to organize the technical learning system network at countryside of Amazonas State by appointing the IFAM - Amazon Federal Institute as a provider to introduce middle and technical schools campus in Amazonas cities. However several physical location construction buildings of this program were delayed or got its structural modifications from original project that does not accomplish the terms and conditions established by the public administration; some of this constructions building suffer work interruption, causing a frustration to the citizen that created expectation on this program. In this vein, the objective of this research was to identify the most efficient building techniques construction to the execution of this works in countryside of the Amazonas State, as well as, to identify the agents that cause their delays and interruptions by comparing with the building techniques accomplished in other countries. The best construction techniques were evaluated by the Performance Identification of Production (IDP) idealized by Gosch and Cardoso (2012), where the companies with the best grades have the best performance. By bibliographic methodology survey to the base and identification of the theoretical point being verified the study case technique as the ideal object research form. The questionnaire to the companies and the users of the schools construction buildings in the countryside of the Amazonas State was the tool of data gathering to answer the research problem. In this research, it is presented the way of performance identification of the companies for comparisons process, as well as, the presentation of the building techniques applied nowadays by the winner companies of the bidding process of IFAM in the countryside of the Amazonas State. By the result obtained from this research, were analyzed the inputs received from construction companies administration staff interviewed, as well as, were consolidated the best practices and techniques for the way to improve the construction of building on the countryside of Amazonas State. === No período entre os anos de 2008 a 2013, o governo federal optou pela estruturação da rede de ensino técnico no interior do estado do Amazonas designando para tal o Instituto Federal do Amazonas (IFAM) para implantar Campus de ensino médio e técnico em municípios do estado do Amazonas. Contudo, diversas obras públicas no interior do estado do Amazonas não cumprem seus prazos, sofrem adequações de serviços e projetos onde em alguns casos até mesmo paralisam a execução destas obras causando frustrações à população que faz uso destas construções. Neste contexto, o objetivo deste trabalho de pesquisa foi identificar as técnicas construtivas mais eficientes para a execução de obras de engenharia no interior do estado do Amazonas, bem como, os fatores que causam os atrasos e paralisações das mesmas, comparando-os com técnicas construtivas executadas em outros países. As melhores técnicas foram avaliadas através do Identificador de Desempenho da Produção (IDP) idealizado por Gosch e Cardoso (2012), onde as empresas com as melhores notas possuem o melhor desempenho. A partir do levantamento bibliográfico para fundamentação e identificação do marco teórico foi verificada a técnica de estudo de caso como a forma ideal de pesquisa do objeto. O questionário às empresas e aos usuários da edificação construídas no interior do estado do Amazonas foi a ferramenta utilizada para a coleta de dados que permitiu buscar uma resposta ao problema da pesquisa. Foi apresentada neste trabalho a forma de identificação de desempenho das empresas para posteriores comparações e a apresentação das técnicas construtivas utilizadas atualmente pelas construtoras vencedoras de certames licitatórios do IFAM no interior do estado do Amazonas. Como resultados obtidos, foram analisados os comentários feitos pelos administradores das empresas entrevistadas assim como elencado um apanhado das melhores técnicas para a condução de obras em municípios do interior do Amazonas.