Analise das Opões reais de um empreendimento de mineração utilizando simulação de Monte carlo
=== Mining projects demand large capital expenditure and are subject to high uncertainty, related to metal price and exchange rate. In this context, the traditional Discounted Cash Flow analysis tends to underestimate the value of the project. Real Options Analysis incorporates the value of manager...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | Portuguese |
Published: |
Universidade Federal de Minas Gerais
2008
|
Online Access: | http://hdl.handle.net/1843/NVEA-7GSP8T |
id |
ndltd-IBICT-oai-bibliotecadigital.ufmg.br-MTD2BR-NVEA-7GSP8T |
---|---|
record_format |
oai_dc |
spelling |
ndltd-IBICT-oai-bibliotecadigital.ufmg.br-MTD2BR-NVEA-7GSP8T2019-01-21T17:54:53Z Analise das Opões reais de um empreendimento de mineração utilizando simulação de Monte carlo Bruno Batista Melin Antonio Sergio de Souza Leonardo Pereira Santiago Carlos Patrício Samanez Mining projects demand large capital expenditure and are subject to high uncertainty, related to metal price and exchange rate. In this context, the traditional Discounted Cash Flow analysis tends to underestimate the value of the project. Real Options Analysis incorporates the value of managerial flexibility in uncertain conditions and, therefore, is a better suited valuation technique. This study values a project that consists of the exploration of a zinc and copper mine and the concentration of these metals based on the Real Option Analysis. The Real Options model incorporates two European options: abandonment and expansion. The numerical method used was the Monte Carlo simulation. Three alternatives to treat the uncertainty were created and compared: modeling of the zinc price as a Geometric Brownian Motion; modeling of the zinc price as a Mean Reverting Process; and modeling each metal price as a Mean Reverting Process, plus modeling the exchange rate as a Geometric Brownian Motion. This studys contribution is to demonstrate that Real Options Analysis, by considering the value of the contingent options existent in a project, can lead to different decisions compared to that obtained by the traditional analysis. Furthermore it gives insights about the implementation strategy of the project. Empreendimentos de mineração envolvem investimento de grande montante de capital e estão sujeitos a um nível elevado de incerteza, principalmente relativa a preços dos metais e à taxa de câmbio. Neste contexto, a análise tradicional de Fluxo de Caixa Descontado tende a subestimar o valor do projeto. A Análise de Opções Reais surge como uma técnica mais adequada de avaliação, por incorporar o valor da flexibilidade gerencial em condições de incerteza ao valor do empreendimento. Este estudo avalia a exploração de uma reserva de zinco e cobre para venda do concentrado desses metais sob a ótica de Opções Reais. O modelo desenvolvido considera duas opções européias: abandono e expansão. O método numérico utilizado é a simulação de Monte Carlo. São criadas e comparadas três alternativas de tratamento da incerteza: modelagem do preço do zinco como um Movimento Browniano Geométrico; modelagem do preço do zinco como um Processo de Reversão à Média; e modelagem do preço de cada metal da reserva como um Processo de Reversão à Média, além da modelagem da taxa de câmbio como um Movimento Browniano Geométrico. O valor obtido a partir da Análise de Opções Reais é comparado com o gerado por meio da análise de Fluxo de Caixa Descontado, indicando o valor agregado pela flexibilidade gerencial. Demonstra-se que a Análise de Opções Reais, por considerar o valor das ações contingenciais existentes em um projeto, pode levar a decisões diferentes das propostas pelas técnicas tradicionais, além de fornecer insights sobre a estratégia de implantação do projeto. 2008-03-27 info:eu-repo/semantics/publishedVersion info:eu-repo/semantics/masterThesis http://hdl.handle.net/1843/NVEA-7GSP8T por info:eu-repo/semantics/openAccess text/html Universidade Federal de Minas Gerais 32001010050P8 - ENGENHARIA DE PRODUÇÃO UFMG BR reponame:Biblioteca Digital de Teses e Dissertações da UFMG instname:Universidade Federal de Minas Gerais instacron:UFMG |
collection |
NDLTD |
language |
Portuguese |
format |
Others
|
sources |
NDLTD |
description |
=== Mining projects demand large capital expenditure and are subject to high uncertainty, related to metal price and exchange rate. In this context, the traditional Discounted Cash Flow analysis tends to underestimate the value of the project. Real Options Analysis incorporates the value of managerial flexibility in uncertain conditions and, therefore, is a better suited valuation technique. This study values a project that consists of the exploration of a zinc and copper mine and the concentration of these metals based on the Real Option Analysis. The Real Options model incorporates two European options: abandonment and expansion. The
numerical method used was the Monte Carlo simulation. Three alternatives to treat the uncertainty were created and compared: modeling of the zinc price as a Geometric Brownian Motion; modeling of the zinc price as a Mean Reverting Process; and modeling each metal price as a Mean Reverting Process, plus modeling the exchange rate as a Geometric Brownian Motion. This studys contribution is to demonstrate that Real Options Analysis, by considering the value of the contingent options existent in a project, can lead to different decisions compared to that obtained by the traditional analysis. Furthermore it gives insights
about the implementation strategy of the project. === Empreendimentos de mineração envolvem investimento de grande montante de capital e estão sujeitos a um nível elevado de incerteza, principalmente relativa a preços dos metais e à taxa de câmbio. Neste contexto, a análise tradicional de Fluxo de Caixa Descontado tende a
subestimar o valor do projeto. A Análise de Opções Reais surge como uma técnica mais adequada de avaliação, por incorporar o valor da flexibilidade gerencial em condições de incerteza ao valor do empreendimento. Este estudo avalia a exploração de uma reserva de
zinco e cobre para venda do concentrado desses metais sob a ótica de Opções Reais. O modelo desenvolvido considera duas opções européias: abandono e expansão. O método numérico utilizado é a simulação de Monte Carlo. São criadas e comparadas três alternativas
de tratamento da incerteza: modelagem do preço do zinco como um Movimento Browniano Geométrico; modelagem do preço do zinco como um Processo de Reversão à Média; e modelagem do preço de cada metal da reserva como um Processo de Reversão à Média, além
da modelagem da taxa de câmbio como um Movimento Browniano Geométrico. O valor obtido a partir da Análise de Opções Reais é comparado com o gerado por meio da análise de Fluxo de Caixa Descontado, indicando o valor agregado pela flexibilidade gerencial.
Demonstra-se que a Análise de Opções Reais, por considerar o valor das ações contingenciais existentes em um projeto, pode levar a decisões diferentes das propostas pelas técnicas tradicionais, além de fornecer insights sobre a estratégia de implantação do projeto. |
author2 |
Antonio Sergio de Souza |
author_facet |
Antonio Sergio de Souza Bruno Batista Melin |
author |
Bruno Batista Melin |
spellingShingle |
Bruno Batista Melin Analise das Opões reais de um empreendimento de mineração utilizando simulação de Monte carlo |
author_sort |
Bruno Batista Melin |
title |
Analise das Opões reais de um empreendimento de mineração utilizando simulação de Monte carlo |
title_short |
Analise das Opões reais de um empreendimento de mineração utilizando simulação de Monte carlo |
title_full |
Analise das Opões reais de um empreendimento de mineração utilizando simulação de Monte carlo |
title_fullStr |
Analise das Opões reais de um empreendimento de mineração utilizando simulação de Monte carlo |
title_full_unstemmed |
Analise das Opões reais de um empreendimento de mineração utilizando simulação de Monte carlo |
title_sort |
analise das opões reais de um empreendimento de mineração utilizando simulação de monte carlo |
publisher |
Universidade Federal de Minas Gerais |
publishDate |
2008 |
url |
http://hdl.handle.net/1843/NVEA-7GSP8T |
work_keys_str_mv |
AT brunobatistamelin analisedasopoesreaisdeumempreendimentodemineracaoutilizandosimulacaodemontecarlo |
_version_ |
1718844300620464128 |