Integra????o dos planos de gerenciamento de res??duos s??lidos e de seguran??a do trabalho para a constru????o civil

Submitted by Sara Ribeiro (sara.ribeiro@ucb.br) on 2017-06-12T12:45:16Z No. of bitstreams: 1 MarineideAlvesdeSousaDissertacaoParcial2012.pdf: 837808 bytes, checksum: 72a094190e6e87453c356080b12f2161 (MD5) === Approved for entry into archive by Sara Ribeiro (sara.ribeiro@ucb.br) on 2017-06-12T12:45:3...

Full description

Bibliographic Details
Main Author: Sousa, Marineide Alves de
Other Authors: Silva, Douglas Jos?? da
Format: Others
Language:Portuguese
Published: Universidade Cat??lica de Bras??lia 2017
Subjects:
Online Access:https://bdtd.ucb.br:8443/jspui/handle/tede/2145
Description
Summary:Submitted by Sara Ribeiro (sara.ribeiro@ucb.br) on 2017-06-12T12:45:16Z No. of bitstreams: 1 MarineideAlvesdeSousaDissertacaoParcial2012.pdf: 837808 bytes, checksum: 72a094190e6e87453c356080b12f2161 (MD5) === Approved for entry into archive by Sara Ribeiro (sara.ribeiro@ucb.br) on 2017-06-12T12:45:37Z (GMT) No. of bitstreams: 1 MarineideAlvesdeSousaDissertacaoParcial2012.pdf: 837808 bytes, checksum: 72a094190e6e87453c356080b12f2161 (MD5) === Made available in DSpace on 2017-06-12T12:45:37Z (GMT). No. of bitstreams: 1 MarineideAlvesdeSousaDissertacaoParcial2012.pdf: 837808 bytes, checksum: 72a094190e6e87453c356080b12f2161 (MD5) Previous issue date: 2012-08-10 === Construction industry has been gaining prominence in Brazil, mainly due to the economic growth of this country. The growth of the construction industry sector contributes to the increase of Construction and Demolition Waste (CDW) in landfill sites and clandestine dumps in large cities, as well as to the rise of workplace accidents in construction sites. The main reason for this scenario is the negligence of the building companies and the lack of inspection by the government. The Integration of the Plans for Solid Waste Management and Safety at Work for Civil Construction aims to meet Resolutions 307 and 448 of the National Environment Council (CONAMA), as well as the Regulatory Standards promulgated by the Ministry of Labor and Employment (MTE). These regulations rule and control such situations and establish the pathway for the building companies and the construction workers to deal with policies and practices for the adequate management of CDW and for safety and health at the construction workplace. The methodological approach adopted in this study is guided by the collection of secondary data, that is, knowledge gained from bibliographical review, which includes national and international sources (books, scientific papers and articles, technical reports, online information and specialized magazines), as well as the Brazilian legislation related to the Management of Waste and Health and Workplace Safety at the Construction Site. The main Brazilian pieces of legislation, technical regulations and certifications analyzed were: Law 12.305, published in August, 2nd 2010, which institutes the National Solid Waste Policy; CONAMA Resolution 307, published in July, 5th 2002, which defines guidelines, criteria and procedures for the management of civil construction waste; Brazilian Norms (NBR) related to the issue of Construction Waste Management; Regulatory Standards issued by the Ministry of Labor and Employment, approved by the Ministerial Directive 3.214, from June 8th, 1978; and the LEED Certificate for new buildings and reforms. In order to study the integration of workplace safety management, the recommendations of the Ministry of Labor and Employment Regulatory Standard 18 were followed. In the study design, two scenarios were considered: 1) designing an Integrated Management Plan in the planning phase of the project, before the beginning of the construction works; 2) designing an Integrated Management Plan for ongoing construction works. For ongoing construction works, a checklist was prepared which was used for the situational diagnosis. Also, verification lists of the Health and Safety at the Workplace Programs (PCMAT, PPRA, and PCMSO) were presented. The study focused on structuring the designing procedures of the Integrated Management Plan; however, it did not contemplate the phases of implementation, monitoring, assessment of results and correction of inconsistencies. The results of this study lead to the conclusion that it is possible to design an Integrated Plan for Solid Waste Management and Workplace Safety in Civil Construction, assuring conformity with the legal requisites. The situational diagnosis for ongoing construction works facilitates and accelerates the planning process of the proposed Integrated Plan. Planning in the project phase will make it easier to reduce issues such as additional costs, delays, and contractual or inspection penalties. In the execution phase, capacity-building is essential, because it is in this phase that the waste is actually managed. Awareness and participation of the workers are indispensable for the success of the processes planned. The Integrated Plan meets the Brazilian norms and legislation related to the Management of Construction and Demolition Waste, as well as the basic requirements of National and International Certification Programs. Searching and fostering more efficient processes and technologies for CDW and Health and Safety at the Workplace must be constant. === A ind??stria da constru????o civil vem ganhando destaque no Brasil principalmente devido ao crescimento econ??mico do pa??s. O aquecimento deste setor contribui para o aumento de Res??duos da Constru????o e Demoli????o (RDC) nos aterros e em ??reas de bota-fora clandestinos espalhados pelas grandes cidades do pa??s, como tamb??m para o aumento de acidentes de trabalho nos canteiros de obras. A principal causa deste cen??rio ?? o descaso por parte das construtoras e a falta de fiscaliza????o pelo governo. A Integra????o dos Planos de Gerenciamento de Res??duos S??lidos e Seguran??a do Trabalho para a Constru????o Civil visa atender as Resolu????es n?? 307 e n?? 448 do Conselho Nacional do Meio Ambiente (CONAMA), assim como as Normas Regulamentadoras do Minist??rio do Trabalho e Emprego (MTE), que regulamentam e controlam tais situa????es e estabelecem os caminhos para as construtoras e profissionais da Constru????o de Obras Civis, no que se refere ??s pol??ticas e as pr??ticas de gerenciamento adequado dos Res??duos da Constru????o e Demoli????o (RCD) e da Seguran??a e Sa??de do Trabalho aplicada ?? constru????o civil. O procedimento metodol??gico adotado neste estudo ?? conduzido pela extra????o de dados secund??rios, isto ??, conhecimentos obtidos por meio de levantamentos bibliogr??ficos com estudo e an??lise de obras nacionais e internacionais (livros, textos e artigos cient??ficos, relat??rios t??cnicos, informa????es via WEB e revistas especializadas), assim como a consulta da legisla????o brasileira relacionada ao tema ???Gerenciamento de Res??duos e da Sa??de e Seguran??a do Trabalho na Constru????o Civil???. Tomou-se como refer??ncia principal a legisla????o brasileira, normas t??cnicas e certifica????es a respeito do tema em estudo, conforme listado: Lei n. 12.305, publicada em 02/08/2010, que institui a Pol??tica Nacional de Res??duos S??lidos; Resolu????o n?? 307 do CONAMA de 05/07/2002, que estabelece diretrizes, crit??rios e procedimentos para a gest??o dos res??duos da constru????o civil; Normas Brasileiras (NBR) relacionadas ao tema Gest??o de Res??duos de Constru????o; Normas Regulamentadoras do Minist??rio do Trabalho e Emprego, aprovadas pela Portaria n. 3.214 de 08/06/78; Certifica????o LEED para novas edifica????es e reformas. Para integra????o do gerenciamento da seguran??a do trabalho foram seguidas as recomenda????es da Norma Regulamentadora (NR) 18 do Minist??rio do Trabalho e Emprego. Na elabora????o do estudo proposto foram considerados dois cen??rios: 1) Elabora????o de Plano Integrado de Gerenciamento na fase de planejamento do projeto (antes do in??cio da obra); 2) Elabora????o de Plano Integrado de Gerenciamento para obras em fase de execu????o (obras em andamento). Para obras em fase de execu????o foi elaborado um checklist para realiza????o do diagn??stico situacional. Em complemento foram apresentadas listas de verifica????o dos Programas de SST exigidos (PCMAT, PPRA, e PCMSO). O estudo proposto restringiu-se ?? estrutura????o dos procedimentos de elabora????o do Plano Integrado de Gerenciamento sem, contudo, contemplar as etapas de implementa????o, monitoramento, avalia????o dos resultados e adequa????o das n??o conformidades. Os resultados obtidos com a realiza????o deste trabalho permitiram concluir que ?? poss??vel a elabora????o de um Plano Integrado de Gerenciamento de Res??duos S??lidos e Seguran??a do Trabalho para a Constru????o Civil, assegurando a conformidade com os requisitos legais. O diagn??stico situacional para obras em andamento viabiliza e agiliza o processo de planejamento do Plano Integrado proposto. O planejamento na fase de projeto da obra poder?? reduzir custos adicionais, atrasos, penalidades contratuais ou de fiscaliza????o, entre outros. Na fase de execu????o a capacita????o dos envolvidos ?? de fundamental import??ncia, pois ?? nesta fase que os res??duos passam por todos os processos do gerenciamento de fato. A conscientiza????o e participa????o por parte da m??o-de-obra s??o imprescind??veis para o sucesso dos processos planejados. O Plano integrado atende as normas e legisla????o brasileira referente ao GRCD, assim como aos requisitos b??sicos para os Programas de Certifica????es nacional e internacional. A busca e o incentivo por processos e tecnologias mais eficazes para o gerenciamento dos RCD e SST devem ser constantes.