ACQUISITION COST ALLOCATION OF REACTIVE POWER SOURCES

CONSELHO NACIONAL DE DESENVOLVIMENTO CIENTÍFICO E TECNOLÓGICO === Este trabalho apresenta três métodos para a identificação dos usuários da rede de transmissão que são beneficiados por novas ou já existentes fontes de potência reativa e, em conseqüência, a repartição do custo de capital entre ele...

Full description

Bibliographic Details
Main Author: MARCO AURELIO MOURA VIEIRA
Other Authors: RICARDO BERNARDO PRADA
Language:Portuguese
Published: PONTIFÍCIA UNIVERSIDADE CATÓLICA DO RIO DE JANEIRO 2001
Online Access:http://www.maxwell.vrac.puc-rio.br/Busca_etds.php?strSecao=resultado&nrSeq=1967@1
http://www.maxwell.vrac.puc-rio.br/Busca_etds.php?strSecao=resultado&nrSeq=1967@2
http://www.maxwell.vrac.puc-rio.br/Busca_etds.php?strSecao=resultado&nrSeq=1967@4
Description
Summary:CONSELHO NACIONAL DE DESENVOLVIMENTO CIENTÍFICO E TECNOLÓGICO === Este trabalho apresenta três métodos para a identificação dos usuários da rede de transmissão que são beneficiados por novas ou já existentes fontes de potência reativa e, em conseqüência, a repartição do custo de capital entre eles. A metodologia para se obter os fatores de alocação de custos, aplicados aos agentes beneficiados, utiliza a análise de um conjunto de contingências de transmissão com suas respectivas probabilidades de ocorrência. Cada um dos métodos propostos utiliza um diferente critério para se medir os benefícios decorrentes da presença de equipamentos de suporte de potência reativa. Os critérios mencionados são os desvios de tensão, os cortes de carga e as injeções de potência reativa, bastante utilizados em estudos de planejamento da operação e da expansão, assim como em análise de confiabilidade de sistemas de potência. A aplicação dos métodos é ilustrada através de estudos de casos com dois sistemas, um sistema simplificado de 5 barras e o IEEE-Reliability Test System (24 barras), no qual um horizonte de três anos é considerado para se fazer a remuneração do equipamento de compensação reativa. === This report presents three methods to identify the transmission consumers in power systems that take advantage of new or existent reactive power sources and, consequently, to allocate its acquisition costs among these consumers. The methodology to obtain the allocation factors, applied to each of the agents, takes into account the analysis of a transmission outages set with their respective probabilities. Each one of the proposed methods uses a different criterion to measure the benefit due to the reactive support provided by such equipments. The mentioned criteria are: voltage deviation, load shedding and reactive power injection. All these methodologies are very used in operational and expansion planning studies, as well as power systems reliability analysis. The application of the methods is shown in case studies with two systems, being the first a 5 bus simplified system and the other, the IEEE-Reliability Test System (24 buses), in which a three years horizon is considered for the reactive power compensation equipment remuneration. === Este trabajo presenta tres métodos para la identificación de los usuários de la red de transmisión que se benefician con las fuentes (nuevas o existenten) de potencia reactiva y, en consecuencia, la repartición del costo de capital entre eles. Hasta aqui, lla metodología para obtener los factores de alocación de costos, aplicados a los agentes beneficiados, utiliza el análisis de un conjunto de contingencias de transmisión con sus respectivas probabilidades de ocurrencia. Cada uno de los métodos propuestos utiliza un critério diferente para medir los beneficios decorrentes de la presencia de equipamentos de soporte de potencia reactiva. Los critérios mencionados son los desvíos de tensión, los cortes de carga y las inyecciones de potencia reactiva, bastante utilizados en estudios de planificación de operación y expansión, así como en análisis de confiabilidad de sistemas de potencia. La aplicación de los métodos se ilustrada a través de estudios de casos con dos sistemas, un sistema simplificado de 5 barras y el IEE Reliability Test Systiene (24 barras), en el cual se considera un horizonte de tres años para realizar la remuneración del equipo de compensación reactiva.