Pilot models for man multi-machine jobs involving systematic delays
Main Author: | Black, Donald Nelson |
---|---|
Published: |
Georgia Institute of Technology
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/1853/25488 |
Similar Items
-
A study of work-time distribution characteristics and their relationship to delay time distribution characteristics for several operators during similar work periods
by: Rogers, Nelson Kimball
Published: (2008) -
An experimental evaluation of the presence of an analyst on work performance times in time study analysis
by: Peñuela, Luis J.
Published: (2008) -
A study of element independence in work cycles
by: Walker, Jack Rudolph
Published: (2008) -
A study of element interdependence
by: Prikel, Klaus
Published: (2008) -
An investigation of the pattern of variation of cycle performance times for a repetitive manual operation
by: Kennedy, Martin Hayes
Published: (2010)