A ratio delay study of long cycle operations performed by a variable labor force

Bibliographic Details
Main Author: Halladay, William Judd
Published: Georgia Institute of Technology 2008
Subjects:
Online Access:http://hdl.handle.net/1853/24515
id ndltd-GATECH-oai-smartech.gatech.edu-1853-24515
record_format oai_dc
spelling ndltd-GATECH-oai-smartech.gatech.edu-1853-245152013-12-15T03:40:20ZA ratio delay study of long cycle operations performed by a variable labor forceHalladay, William JuddTime studyGeorgia Institute of Technology2008-09-11T11:31:35Z2008-09-11T11:31:35Z1955-08Thesishttp://hdl.handle.net/1853/24515107588Access restricted to authorized Georgia Tech users only.
collection NDLTD
sources NDLTD
topic Time study
spellingShingle Time study
Halladay, William Judd
A ratio delay study of long cycle operations performed by a variable labor force
author Halladay, William Judd
author_facet Halladay, William Judd
author_sort Halladay, William Judd
title A ratio delay study of long cycle operations performed by a variable labor force
title_short A ratio delay study of long cycle operations performed by a variable labor force
title_full A ratio delay study of long cycle operations performed by a variable labor force
title_fullStr A ratio delay study of long cycle operations performed by a variable labor force
title_full_unstemmed A ratio delay study of long cycle operations performed by a variable labor force
title_sort ratio delay study of long cycle operations performed by a variable labor force
publisher Georgia Institute of Technology
publishDate 2008
url http://hdl.handle.net/1853/24515
work_keys_str_mv AT halladaywilliamjudd aratiodelaystudyoflongcycleoperationsperformedbyavariablelaborforce
AT halladaywilliamjudd ratiodelaystudyoflongcycleoperationsperformedbyavariablelaborforce
_version_ 1716619198260576256