Characteristics and outcomes of advanced refunding of school construction bonds in Indiana
This study examined advanced refundings of Indiana school construction bonds from 1993 to 1996. Purposes were to: (a) add to the professional knowledge base about advanced refundings; (b) evaluate the financial consequences on taxpayers; (c) determine benefits as measured by interest rates, terms, a...
Main Author: | Gabriel, Paul G. |
---|---|
Other Authors: | Kowalski, Theodore J. |
Format: | Others |
Published: |
2011
|
Subjects: | |
Online Access: | http://cardinalscholar.bsu.edu/handle/handle/176289 http://liblink.bsu.edu/uhtbin/catkey/1117122 |
Similar Items
-
Selected variables as predictors of Indiana public school building corporation net interest costs and bond bids, 1970-1974
by: Eckert, John L.
Published: (2011) -
An examination of selected factors of public school construction in Indiana, 1966-1968
by: Morrison, Richard William
Published: (2011) -
The selection of architectural firms in Indiana school construction projects
by: Nixon, Andrew Mark
Published: (2011) -
Selected variables as predictors of Indiana public school building corporation bond bids and interest rates
by: Ferguson, Ralph A.
Published: (2011) -
Nontraditional revenue sources being used by Indiana school corporations and Indiana high schools
by: Rozelle, Zachari D.
Published: (2011)