Optimising Turnaround Maintenance (TAM) Scheduling of Gas plants in Libya
Gas plants consist of several pieces of both critical static and rotating equipment, which operate continuously under severe operating conditions. These pieces of equipment are permanently subjected to be inspected and maintained during total shutdown of plant facilities to execute Turnaround Mainte...
Main Author: | El Werfalli, Abdelnaser A.K. |
---|---|
Other Authors: | Khan, M. Khurshid |
Language: | en |
Published: |
University of Bradford
2019
|
Subjects: | |
Online Access: | http://hdl.handle.net/10454/17324 |
Similar Items
-
A new methodology to optimize Turnaround Maintenance (TAM) scheduling for gas plants
by: Elwerfalli, A.A., et al.
Published: (2018) -
Implementation of Risk-Based Inspection (RBI) in Condensate Separator and Storage Vessel: A Case Study
by: Nurhadi Siswantoro, et al.
Published: (2021-03-01) -
Analisa Risiko dan Langkah Mitigasi Pada Offshore Pipeline
by: Wahyu Abdullah, et al.
Published: (2012-09-01) -
Risk Management in Process Industry - Practical Approach in Poland
by: Andrzej Kozak
Published: (2011-11-01) -
Diseño de un software para el análisis y evaluación de riesgo basado en las normas API 580 y 581
by: Andy Quintero Castillo, et al.
Published: (2013-06-01)