Comparing Time and Accuracy of Building Information Modeling to On-Screen Takeoff for a Quantity Takeoff of a Conceptual Estimate
Estimating is a critical aspect of every construction project. The most tedious component of an estimate is the quantity takeoff. Different tools are available to improve an estimator's productivity for a quantity takeoff. Faster quantity takeoffs enable estimator to bid more jobs. This study a...
Main Author: | Alder, Morgan A. |
---|---|
Format: | Others |
Published: |
BYU ScholarsArchive
2006
|
Subjects: | |
Online Access: | https://scholarsarchive.byu.edu/etd/509 https://scholarsarchive.byu.edu/cgi/viewcontent.cgi?article=1508&context=etd |
Similar Items
-
Rancang Bangun Sistem Takeoff Unmanned Aerial Vehicle Quadrotor Berbasis Sensor Jarak Inframerah
by: Bardo Wenang, et al.
Published: (2012-09-01) -
Computer simulation of the takeoff in springboard diving
by: Kong, Pui W.
Published: (2005) -
Design and Implementation of Quantity Calculation Method Based on BIM Data
by: Cha, H.S, et al.
Published: (2022) -
TO THE STUDY OF WAKE VORTEX BEHIND THE AIRBUS-380 CHARACTERISTICS AT TAKEOFF AND LANDING
by: A. I. Zhelannikov
Published: (2017-01-01) -
Metoda Short Takeoff Landing (Studi Kasus Prestasi Terbang Takeoff-Landing Pesawat Udara Turbo Prop CN235)
by: Sayuti Syamsuar
Published: (2017-08-01)