Uncertainty management in repetitive building projects using WIP buffers

Variability in production as a special kind of uncertainty is one of the largest factors that negatively impacts construction project performance. A common construction practice to protect production systems from variability is the use of buffers (Bf). Construction practitioners and researchers have...

Full description

Bibliographic Details
Main Author: Gonzalez, V
Other Authors: Alarcon, LF
Published: ResearchSpace@Auckland 2012
Online Access:http://hdl.handle.net/2292/18893
id ndltd-AUCKLAND-oai-researchspace.auckland.ac.nz-2292-18893
record_format oai_dc
spelling ndltd-AUCKLAND-oai-researchspace.auckland.ac.nz-2292-188932012-07-03T11:37:37ZUncertainty management in repetitive building projects using WIP buffersGonzalez, VVariability in production as a special kind of uncertainty is one of the largest factors that negatively impacts construction project performance. A common construction practice to protect production systems from variability is the use of buffers (Bf). Construction practitioners and researchers have proposed buffering approaches for different production situations, but these approaches have faced either theoretical limitations in its formulation or practical limitations in their application. For overcoming these limitations, a general methodology to design and manage Bf at strategic, tactical and operational scheduling levels based on lean production principles is proposed in this thesis. This methodology is focused on repetitive building projects in which Work-In-Process (WIP) is used as Bf. At strategic level, the methodology considers a multiobjective analytic model (MAM) to design WIP Bf which is based on simulation optimization (SO) modeling and Pareto Front concepts. At tactical level, the methodology uses the SO modeling approach to design WIP Bf which applies Evolutionary Strategies (ES) as optimization search approach. Both approaches MAM and SO modeling allow for the design of optimum WIP Bf sizes by optimizing different projects objectives (e.g. project cost, time and productivity). At operational level, the Rational Commitment Model (RCM) is used in the methodology to manage WIP Bf. RCM is an operational decision-making tool for production planning and commitment negotiation which is constructed as a statistical model. RCM helps to determine optimum WIP Bf sizes optimizing labor productivity. Nomographs for WIP Bf manipulation of practical use were developed for the MAM and the RCM. The application advantages of the WIP Bf design and management methodology were demonstrated through its hypothetical and real application in repetitive building projects at the different scheduling levels. The main results were reduction of the variability impacts, leading to general improvements over project performance. A closer examination of these results showed that the most important impacts were the reduction of project costs and the increment of labor productivity. In addition, this research motivated the explicit use of WIP Bf in the studied projects, changing in some cases the Bf management culture in on-site organization. Further research should be made in order to explore and test the application of the general methodology to WIP Bf design and management as a whole.ResearchSpace@AucklandAlarcon, LF2012-06-06T21:51:34Z2012-06-06T21:51:34Z2008ThesisSub type: PhD Thesis. Supervisors: Alarcon LF. Pontificia Universidad Catolica de Chile, 29 Oct 2008http://hdl.handle.net/2292/18893PhD Thesis - University of AucklandItems in ResearchSpace are protected by copyright, with all rights reserved, unless otherwise indicated. Previously published items are made available in accordance with the copyright policy of the publisher.https://researchspace.auckland.ac.nz/docs/uoa-docs/rights.htmCopyright: The authorhttp://purl.org/eprint/accessRights/RestrictedAccess
collection NDLTD
sources NDLTD
description Variability in production as a special kind of uncertainty is one of the largest factors that negatively impacts construction project performance. A common construction practice to protect production systems from variability is the use of buffers (Bf). Construction practitioners and researchers have proposed buffering approaches for different production situations, but these approaches have faced either theoretical limitations in its formulation or practical limitations in their application. For overcoming these limitations, a general methodology to design and manage Bf at strategic, tactical and operational scheduling levels based on lean production principles is proposed in this thesis. This methodology is focused on repetitive building projects in which Work-In-Process (WIP) is used as Bf. At strategic level, the methodology considers a multiobjective analytic model (MAM) to design WIP Bf which is based on simulation optimization (SO) modeling and Pareto Front concepts. At tactical level, the methodology uses the SO modeling approach to design WIP Bf which applies Evolutionary Strategies (ES) as optimization search approach. Both approaches MAM and SO modeling allow for the design of optimum WIP Bf sizes by optimizing different projects objectives (e.g. project cost, time and productivity). At operational level, the Rational Commitment Model (RCM) is used in the methodology to manage WIP Bf. RCM is an operational decision-making tool for production planning and commitment negotiation which is constructed as a statistical model. RCM helps to determine optimum WIP Bf sizes optimizing labor productivity. Nomographs for WIP Bf manipulation of practical use were developed for the MAM and the RCM. The application advantages of the WIP Bf design and management methodology were demonstrated through its hypothetical and real application in repetitive building projects at the different scheduling levels. The main results were reduction of the variability impacts, leading to general improvements over project performance. A closer examination of these results showed that the most important impacts were the reduction of project costs and the increment of labor productivity. In addition, this research motivated the explicit use of WIP Bf in the studied projects, changing in some cases the Bf management culture in on-site organization. Further research should be made in order to explore and test the application of the general methodology to WIP Bf design and management as a whole.
author2 Alarcon, LF
author_facet Alarcon, LF
Gonzalez, V
author Gonzalez, V
spellingShingle Gonzalez, V
Uncertainty management in repetitive building projects using WIP buffers
author_sort Gonzalez, V
title Uncertainty management in repetitive building projects using WIP buffers
title_short Uncertainty management in repetitive building projects using WIP buffers
title_full Uncertainty management in repetitive building projects using WIP buffers
title_fullStr Uncertainty management in repetitive building projects using WIP buffers
title_full_unstemmed Uncertainty management in repetitive building projects using WIP buffers
title_sort uncertainty management in repetitive building projects using wip buffers
publisher ResearchSpace@Auckland
publishDate 2012
url http://hdl.handle.net/2292/18893
work_keys_str_mv AT gonzalezv uncertaintymanagementinrepetitivebuildingprojectsusingwipbuffers
_version_ 1716390981991923712