Optimal Capacity Conversion for Product Transitions Under High Service Requirements
We consider the capacity planning problem during a product transition in which demand for a new-generation product gradually replaces that for the old product. Capacity for the new product can be acquired both by purchasing new production lines and by converting existing production lines for the old...
Main Authors: | Li, Hongmin (Author), Graves, Stephen C. (Contributor), Huh, Woonghee Tim (Author) |
---|---|
Other Authors: | Sloan School of Management (Contributor) |
Format: | Article |
Language: | English |
Published: |
Institute for Operations Research and the Management Sciences (INFORMS),
2014-10-09T16:54:26Z.
|
Subjects: | |
Online Access: | Get fulltext |
Similar Items
-
Optimal Planning Quantities for Product Transition
by: Li, Hongmin, et al.
Published: (2012) -
Contract farming in a developing country with possible reneging: Can it work?
by: Woonghee Tim Huh, et al.
Published: (2012-12-01) -
Contract farming with possible reneging in a developing country: Can it work?
by: Woonghee Tim Huh, et al.
Published: (2012-12-01) -
SUMOylation is required for optimal TRAF3 signaling capacity.
by: Sophia Miliara, et al.
Published: (2013-01-01) -
On the requirements for protocol conversion.
by: Beyers, Kirsten Julia.
Published: (2009)