The CMS Data Acquisition - Architectures for the Phase-2 Upgrade
The upgraded High Luminosity LHC, after the third Long Shutdown (LS3), will provide an instantaneous luminosity of 7.5 × 10 34 cm⁻² s⁻¹ (levelled), at the price of extreme pileup of up to 200 interactions per crossing. In LS3, the CMS Detector will also undergo a major upgrade to prepare for the pha...
Similar Items
-
Performance of the CMS Event Builder
by: Andre, J-M, et al.
Published: (2019) -
New operator assistance features in the CMS Run Control System
by: Andre, J-M, et al.
Published: (2019) -
DAQExpert - An expert system to increase CMS data-taking efficiency
by: Andre, J-M, et al.
Published: (2019) -
A scalable monitoring for the CMS Filter Farm based on elasticsearch
by: Andre, J-M, et al.
Published: (2017) -
The FEROL40, a microTCA card interfacing custom point-to-point links and standard TCP/IP
by: Gigi, Dominique, et al.
Published: (2021)