The application of fault signature analysis in Tenaga Nasional Berhad Malaysia
Unplanned electrical power outages are a major concern to power utilities throughout the whole world. Unfortunately, power outages will continue to occur and they cannot be fully prevented. It could be the result of lightning strikes, tree encroachment, or equipment failure. However, the impact can...
Main Authors: | Zin, Abdullah Asuhaimi M. (Author), Karim, S. P. A. (Author) |
---|---|
Format: | Article |
Language: | English |
Published: |
Institute of Electrical and Electronics Engineers,
2007-10.
|
Subjects: | |
Online Access: | Get fulltext |
Similar Items
-
Variation orders in transmission projects of Tenaga Nasional Berhad
by: Abdul Kudus, Baharuddin
Published: (2005) -
THE KEY SUCCESS FACTOR OF GEOGRAPHIC INFORMATION SYSTEM RE-IMPLEMENTATION IN TENAGA NASIONAL BERHAD DISTRIBUTION, MALAYSIA: A CASE STUDY OF CHERAS TENAGA NASIONAL BERHAD DISTRIBUTION STATION
by: Fazilah Mat Yatim, et al.
Published: (2019-01-01) -
The key success factor of geographic information system re-implementation in Tenaga Nasional Berhad distribution, Malaysia: a case study of Cheras Tenaga Nasional Berhad distribution station
by: Mat Yatim, Fazilah, et al.
Published: (2019) -
Feasibility analysis on capacitor Bank Installed in Tenaga Nasional Berhad Substation
by: Wahab, Shairul Wizmar
Published: (2012) -
BOUNDARY RE-ASSESSMENT OF THE METER READING UNIT (MRU) FOR TENAGA NASIONAL BERHAD, TNB CHERAS
by: A. Zulkflee, et al.
Published: (2019-10-01)