Enforceability of the liquidated and ascertained damages and effect of section 75 contracts ACT 1950
The usual redress awarded to the employer in the event of a breach of contract due to late completion will be in the form of liquidated damages. Liquidated damages, or commonly known as Liquidated and Ascertained Damages, abbreviated as 'LAD' is sought as the sequel to a non-completion of...
Main Author: | Mohamad, Shazlimanshah (Author) |
---|---|
Format: | Thesis |
Published: |
2019.
|
Subjects: | |
Online Access: | Get fulltext |
Similar Items
-
Interpretation of contracts : admissibility of pre-contractual negotiations
by: Mohamad Khairuddi, Muhammad Khawarizmi
Published: (2019) -
Profiling of termination grounds in construction contract
by: Liew, Sock Tin
Published: (2018) -
The profile of breaches of contract in construction industry
by: Zainudin, Farah Liyana
Published: (2019) -
Contract administrator's liability for pure economic loss
by: Abdul Rahman, Atikah
Published: (2017) -
Variation in the standard form of contract in Malaysia and Indonesia
by: Rahmatyo, Bayu Dwi
Published: (2015)