Consequences of non-value adding activities on construction project performance
Non-value adding activities (NVAAs) are considered as problematic in project management. If the NVAAs are not determined, the performance of the contractor during the construction process will be affected. Most of the construction practitioner does not realize that most of the activities performed d...
Main Author: | Abdul Rahim, Abdul Rafie (Author) |
---|---|
Format: | Thesis |
Published: |
2019-01.
|
Subjects: | |
Online Access: | Get fulltext |
Similar Items
-
Exploiting building information modeling throughout the whole lifecycle of construction projects
by: Mohandes, Saeed Reza, et al.
Published: (2014) -
Managing construction project risks; case study: contractors in Johor Bahru
by: Abdul Rahiman, Nafisah
Published: (2006) -
Performance of cold in place recycle method for different stabilization agents
by: Abdul Hamid, Abdul Rahim
Published: (2015) -
Improvement measures of cost overruns in residential construction project in Malaysia
by: Rahim, Nur Syafika Artika
Published: (2020) -
Factors causing the poor performance of construction project
by: Tatiana Rina Puspasari, Tatiana Rina Puspasari
Published: (2005)