A systematic approach for monitoring and evaluating the construction project progress
A persistent problem in construction is to document changes which occur in the field and to prepare the as-built schedule. In current practice, deviations from planned performance can only be reported after significant time has elapsed and manual monitoring of the construction activities are costly...
Main Authors: | Memon, Zubair Ahmed (Author), Abd. Majid, Muhd. Zaimi (Author), Mustaffar, Mushairry (Author) |
---|---|
Format: | Article |
Language: | English |
Published: |
The Institution of Engineers, Malaysia,
2006-09.
|
Subjects: | |
Online Access: | Get fulltext |
Similar Items
-
The use of photogrammetry techniques to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2006) -
A systematic procedure for developing the 3D model to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2007) -
Comparison between piezoelectric and capacitive sensors for PD detection and signal monitoring in palm oil
by: Hameed, Ahmed Majid
Published: (2014) -
Procurement methods in reducing disputes for construction projects
by: Abdul Aziz, Abdullahi
Published: (2014) -
Development of electrical discharge machining power generator
by: Muhd. Radzi, Muhd. Abu Bakar
Published: (2015)