Proof of documentation in claming extension of time
Construction projects have become increasingly complex and are subject to various risks, thus delays or disruptions to project programmes become an unavoidable issue. In Malaysian Standard Forms of Contract, the lists of relevant events are provided to allow the contractor to claim for extension of...
Main Author: | Wong, Ing Sing (Author) |
---|---|
Format: | Thesis |
Published: |
2016-09.
|
Subjects: | |
Online Access: | Get fulltext |
Similar Items
-
Documentation of Seri Menanti palace using three-dimensional phase shift terrestrial laser scanner
by: Cheong, Siew Chin
Published: (2013) -
Time at large: implication for liquidated damages
by: Mustaffar Kamar, Nurul Iman
Published: (2017) -
Time risk assessment framework for highway projects in Nigeria
by: Salawu, Rasheed Adewale
Published: (2016) -
Petrological and strength properties of granite in Johor
by: Wong, Grace Ming Chia
Published: (2012) -
Extending the geological calibration of the geological time scale
by: Pälike, Heiko
Published: (2002)