The framework for minimizing construction time and cost overruns in Padang and Pekanbaru, Indonesia
It has been said that Indonesian constructions often suffer serious cost and time overrun. Kaming et.al., (1997a) and Trigunarsyah (2004) have studied the causes of these problems. However, their studies focused only on the high rise buildings in Jakarta and Yogyakarta. Since Indonesia is a large co...
Main Author: | Harisaweni, Harisaweni (Author) |
---|---|
Format: | Thesis |
Published: |
2007-01.
|
Subjects: | |
Online Access: | Get fulltext |
Similar Items
-
A framework for quality maintenance system in construction industry
by: Tiong, Kung Leong
Published: (2014) -
A contingency-based framework of strategic management accounting, sophisticated budgeting and costing techniques in Malaysian small and medium enterprises
by: Kalkhouran, Abolfazl Amanollah Nejad
Published: (2015) -
The legal status of construction work programme in the construction industry
by: Othman, Siti Fairus
Published: (2009) -
Developing institutional framework of social entrepreneurship
by: Sohel, Mir Hossain
Published: (2018) -
Pengaruh risiko terhadap kecekapan perbankan Islam di Indonesia
by: Arsal, Muryani
Published: (2017)