Development of database management system (DBMS) based on elemental cost analysis (ECA) methodology
For 30 years, major Quantity Surveying (QS) consultants from the developed country have started to produce the Database Management System (DBMS) for estimating process. Development and installation of the software required high expenses. These conditions encourage the development of estimating softw...
Main Author: | Berahim @ Ibrahim, Siti Khairizan (Author) |
---|---|
Format: | Thesis |
Published: |
2006-05.
|
Subjects: | |
Online Access: | Get fulltext |
Similar Items
-
Database management inventory system
by: Aripin, Syahida
Published: (2006) -
Development of quantitative quality cost matrix for Malaysian construction quality management system
by: Che Ali, Mukhtar
Published: (2010) -
Pre-contract cost management: a study on risk management and its effect towards costs
by: Mohd. Kassim, Nazirul Fariq
Published: (2018) -
Pre-contract cost management:|ba study on risk management and its effect towards costs
by: Mohd. Kassim, Nazirul Fariq
Published: (2018) -
Time cost model for water related projects
by: Ahmad, Siti Farida
Published: (2020)