Six sigma approach to real time cast in-situ slab concreting process improvement
The best way of construction processes improvement is by problem solving approaches. Before problems start to emerge in construction phases. In accordance to experiencing in real time problem solving approaches in other industries processes this study suggest that its time to go toward other industr...
Main Author: | Niaraki, Seyed Ali Mousavi (Author) |
---|---|
Format: | Thesis |
Published: |
2010-03.
|
Subjects: | |
Online Access: | Get fulltext |
Similar Items
-
Energy and CO2 emission evaluation of concrete waste
by: Rashvand, Pooria
Published: (2009) -
Integration of safety, health, environment and quality (SHEQ) management system in construction : a review
by: Abdul Harnid, Abdul Rahim, et al.
Published: (2004) -
The level of compliance to safety audit in construction industry
by: Awang, Ahmad Fauzi
Published: (2007) -
Best practices in safety management for conventional civil construction industry in Malaysia
by: Ahmad, Rosli
Published: (2008) -
A framework for cost assessment of qms for building contractors based on biological immune system
by: Keyvanfar, Ali
Published: (2009)