Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry / Muhammad Razif Abdullah Make...[et al.]

Assembly Line Balancing (ALB) plays a vital function especially in the production line. The installation of an assembly line is a long-term decision and requires large capital of investments. It is important that such a system is designed and balanced so that it able to work efficiently as possible....

Full description

Bibliographic Details
Main Authors: Abdullah Make, Muhammad Razif (Author), Faisae Rashid, Mohd Fadzil (Author), Razali, Muhamad Magffierah (Author), Perumal, Manugari (Author)
Format: Article
Language:English
Published: Faculty of Mechanical Engineering Universiti Teknologi MARA (UiTM), 2017.
Subjects:
Online Access:Get fulltext
LEADER 01638 am a22001813u 4500
001 39040
042 |a dc 
100 1 0 |a Abdullah Make, Muhammad Razif  |e author 
700 1 0 |a Faisae Rashid, Mohd Fadzil  |e author 
700 1 0 |a Razali, Muhamad Magffierah  |e author 
700 1 0 |a Perumal, Manugari  |e author 
245 0 0 |a Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry / Muhammad Razif Abdullah Make...[et al.] 
260 |b Faculty of Mechanical Engineering Universiti Teknologi MARA (UiTM),   |c 2017. 
520 |a Assembly Line Balancing (ALB) plays a vital function especially in the production line. The installation of an assembly line is a long-term decision and requires large capital of investments. It is important that such a system is designed and balanced so that it able to work efficiently as possible. Many previous researches have proposed different heuristic approach in optimizing the assembly line. However little attention is given toward simulation analysis as proved of the proposed method. In this paper, a real industrial data of simple ALB problem is optimized and simulated for minimizing the number of workstation. Three proposed heuristics in order to improve the efficiency of the production are reviewed before a discrete simulation approach is used to compare the optimized performance. The anticipated performance of computational result is obtained from the problem comprising the workstation and labour performance output. 
650 0 4 |a TJ Mechanical engineering and machinery 
655 7 |a Article  |2 local 
655 7 |a PeerReviewed  |2 local 
856 |z Get fulltext  |u https://ir.uitm.edu.my/id/eprint/39040/