Lean methodology to reduce waste in a construction environment

Productivity and waste factors are interdependent of each other. Waste is a major problem in the construction industry which amounts to 60% of the construction effort. A study focused on the construction efficiency by the National Institute of Standards and Technology in the UK has documented 25% -...

Full description

Bibliographic Details
Main Authors: Vilasini, N (Author), Neitzert, TR (Author), Gamage, JR (Author)
Other Authors: Rameezdeen, R (Contributor), Senaratne, S (Contributor)
Format: Others
Published: Pacific Association of Quantity Surveyors (PAQS), 2011-08-23T03:17:41Z.
Subjects:
Online Access:Get fulltext
LEADER 02197 am a22002413u 4500
001 1813
042 |a dc 
100 1 0 |a Vilasini, N  |e author 
100 1 0 |a Rameezdeen, R  |e contributor 
100 1 0 |a Senaratne, S  |e contributor 
700 1 0 |a Neitzert, TR  |e author 
700 1 0 |a Gamage, JR  |e author 
245 0 0 |a Lean methodology to reduce waste in a construction environment 
260 |b Pacific Association of Quantity Surveyors (PAQS),   |c 2011-08-23T03:17:41Z. 
500 |a Proceedings of the 15th Pacific Association of Quantity Surveyors Congress annual meeting, Colombo, Sri Lanka, pp. 555 - 564 
520 |a Productivity and waste factors are interdependent of each other. Waste is a major problem in the construction industry which amounts to 60% of the construction effort. A study focused on the construction efficiency by the National Institute of Standards and Technology in the UK has documented 25% - 50 % of waste relates to coordinating labour and managing, moving, and installing materials. Therefore the main aim of this study is to find out the possibilities of waste reduction in the construction industry through lean construction applications. The method adopted for this study is a case study research approach where it concludes the results obtained from a major construction project in New Zealand. A pilot case study was carried out to understand the existing practices. The research study substantially followed the process mapping method to identify the level of concern in waste minimisation on a construction site. Outcomes from the studies indicate that one third of non value adding activities are resulting from factors under the control of management. This study concludes that there are more opportunities to eliminate waste and add value to the construction process. Hence by improving management practices through a lean implementation the non value adding time of a construction project can be reduced and thereby productivity can be improved significantly. 
540 |a OpenAccess 
650 0 4 |a Lean Methodology 
650 0 4 |a Process Map 
650 0 4 |a Value 
650 0 4 |a Waste 
655 7 |a Conference Contribution 
856 |z Get fulltext  |u http://hdl.handle.net/10292/1813