An Adapted Firefly Algorithm for Product Development Project Scheduling with Fuzzy Activity Duration
Efficient scheduling plays an important role in product development project management, especially for the product development project with fuzzy activity times. In this research a trapezoidal fuzzy number is used to represent fuzzy activity duration, and an improved magnitude of the trapezoidal fuz...
Main Authors: | Minmei Huang, Jijun Yuan, Jing Xiao |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2015-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2015/973291 |
Similar Items
-
Improved Firefly Algorithm for Solving Multi-mode Resource-Constrained Project Scheduling Problems
by: Shih-Che Huang, et al.
Published: (2017) -
Self-Adaptive Step Firefly Algorithm
by: Shuhao Yu, et al.
Published: (2013-01-01) -
Credibility based chance constrained programming for project scheduling with fuzzy activity durations
by: Oğuzhan Ahmet Arık
Published: (2019-04-01) -
Firefly Algorithm for the Flow Shop Scheduling Problem with Blocking Constraint
by: Ge-Han Li, et al.
Published: (2011) -
Workflow Scheduling in Cloud Environment Using Firefly Optimization Algorithm
by: Shahin Ghasemi, et al.
Published: (2019-08-01)