Determination of optimal work start time

The question is: whether the system total travel cost and travel time are reduced by adjusting the work start time or not? This paper proposes the two-level model for answering the question; the upper-level minimizes the system travel cost and travel time by using the work start time as a decision v...

Full description

Bibliographic Details
Main Author: S.-G. Li
Format: Article
Language:English
Published: Vilnius Gediminas Technical University 2007-03-01
Series:Transport
Subjects:
Online Access:http://www.transport.vgtu.lt/upload/tif_zur/2007-1-li.pdf