Summary: | In view of the slow speed and poor effect of real-time rendering of large-scale reservoir geological grid model, a new grid model hidden algorithm is proposed by analyzing the Eclipse reservoir grid model storage format, grid model representation, and cell sorting rule, which optimizes the original grid data and improves the rendering speed of reservoir grid model. The algorithm in this paper eliminates hidden points and faces according to the topological relationship of the grid, and finally, only the visible point and face data are extracted as the final visual input data. Through the realization of 3D visualization software of reservoir geological model and well trajectory, the correctness and efficiency of the hidden algorithm are verified. In the software, firstly, the number of display grids is effectively reduced by preprocessing, and the 3D graphics technology of WPF and helix is adopted to realize the high-efficiency display of reservoir grids. The comparison test of different scale reservoir models shows that the method can reduce the point and surface data by more than 85% and shows that the speed optimization effect is significant. The 3D display function realizes the interactive functions such as roaming, zooming, and viewpoint switching of the reservoir model, truly reveals again the geological environment and borehole information of underground drilling, which is helpful for drilling interpretation and decision-making, provides a reasonable drilling tracking geological target drilling scheme for the drilling process, and realizes the seamless connection of geological engineering integration.
|