Long-Term Decision on Wind Investment with Considering Different Load Ranges of Power Plant for Sustainable Electricity Energy Market
The aim of this paper is to provide a bi-level model for the expansion planning on wind investment while considering different load ranges of power plants in power systems at a multi-stage horizon. Different technologies include base load units, such as thermal and water units, and peak load units s...
Main Authors: | Jaber Valinejad, Mousa Marzband, Mudathir Funsho Akorede, Ian D Elliott, Radu Godina, João Carlos de Oliveira Matias, Edris Pouresmaeil |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2018-10-01
|
Series: | Sustainability |
Subjects: | |
Online Access: | http://www.mdpi.com/2071-1050/10/10/3811 |
Similar Items
-
Investment Incentives in Competitive Electricity Markets
by: Jaber Valinejad, et al.
Published: (2018-10-01) -
A Centralized Smart Decision-Making Hierarchical Interactive Architecture for Multiple Home Microgrids in Retail Electricity Market
by: Masoumeh Javadi, et al.
Published: (2018-11-01) -
Investment evaluation of wind turbine relocation
by: Hasan Huseyin Yildirim, et al.
Published: (2019-03-01) -
Simulation and Comparison of Mathematical Models of PV Cells with Growing Levels of Complexity
by: Eduardo Manuel Godinho Rodrigues, et al.
Published: (2018-10-01) -
Uncertainty-Based Models for Optimal Management of Energy Hubs Considering Demand Response
by: Arsalan Najafi, et al.
Published: (2019-04-01)