Solving Integrated Process Planning, Dynamic Scheduling, and Due Date Assignment Using Metaheuristic Algorithms
Because the alternative process plans have significant contributions to the production efficiency of a manufacturing system, researchers have studied the integration of manufacturing functions, which can be divided into two groups, namely, integrated process planning and scheduling (IPPS) and schedu...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2019-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2019/1572614 |