Study on safety operation of medium voltage distribution network
Aiming at the problem of safe operation in the medium voltage distribution network with neutral point grounding through small resistance, the distribution network model was built, and on this basis, MW-level photovoltaic (PV) system, doubly fed Induction generator (DFIG) wind turbine, permanent magn...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Subjects: | |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/36/e3sconf_aepee2021_02004.pdf |
id |
doaj-fd48f02d2601442cb44f6191e200ebb9 |
---|---|
record_format |
Article |
spelling |
doaj-fd48f02d2601442cb44f6191e200ebb92021-05-28T14:41:16ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012600200410.1051/e3sconf/202126002004e3sconf_aepee2021_02004Study on safety operation of medium voltage distribution networkChen Xiaofang0Chen Li’an1Wang Dong2Chen Qihao3Xiamen University of Technology, School of Electrical Engineering and AutomationXiamen University of Technology, School of Electrical Engineering and AutomationState Grid Department of Safety and Quality Supervision BeijingXiamen University of Technology, School of Electrical Engineering and AutomationAiming at the problem of safe operation in the medium voltage distribution network with neutral point grounding through small resistance, the distribution network model was built, and on this basis, MW-level photovoltaic (PV) system, doubly fed Induction generator (DFIG) wind turbine, permanent magnet synchronous generator (PMSG) wind turbine and energy storage device was connected respectively in this paper. The ground current and earth potential rise was studied when the power was delivered by mistake. The simulation results show that in the system with neutral point grounding through small resistance, whether it is the traditional or the active distribution network, the three-phase power delivery method is more able to ensure the personal safety of power grid operators. However, The access to distributed generator (DG) in the distribution network will have a greater impact on ground current and earth potential rise in the case of three-phase power delivery. Especially when the ground current and earth potential rise will increase after DG connected to distribution network, which is still likely to pose a threat to personal safety and needs further research.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/36/e3sconf_aepee2021_02004.pdfsafe operationpvdfigpmsgenergy storage device |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Chen Xiaofang Chen Li’an Wang Dong Chen Qihao |
spellingShingle |
Chen Xiaofang Chen Li’an Wang Dong Chen Qihao Study on safety operation of medium voltage distribution network E3S Web of Conferences safe operation pv dfig pmsg energy storage device |
author_facet |
Chen Xiaofang Chen Li’an Wang Dong Chen Qihao |
author_sort |
Chen Xiaofang |
title |
Study on safety operation of medium voltage distribution network |
title_short |
Study on safety operation of medium voltage distribution network |
title_full |
Study on safety operation of medium voltage distribution network |
title_fullStr |
Study on safety operation of medium voltage distribution network |
title_full_unstemmed |
Study on safety operation of medium voltage distribution network |
title_sort |
study on safety operation of medium voltage distribution network |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2021-01-01 |
description |
Aiming at the problem of safe operation in the medium voltage distribution network with neutral point grounding through small resistance, the distribution network model was built, and on this basis, MW-level photovoltaic (PV) system, doubly fed Induction generator (DFIG) wind turbine, permanent magnet synchronous generator (PMSG) wind turbine and energy storage device was connected respectively in this paper. The ground current and earth potential rise was studied when the power was delivered by mistake. The simulation results show that in the system with neutral point grounding through small resistance, whether it is the traditional or the active distribution network, the three-phase power delivery method is more able to ensure the personal safety of power grid operators. However, The access to distributed generator (DG) in the distribution network will have a greater impact on ground current and earth potential rise in the case of three-phase power delivery. Especially when the ground current and earth potential rise will increase after DG connected to distribution network, which is still likely to pose a threat to personal safety and needs further research. |
topic |
safe operation pv dfig pmsg energy storage device |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/36/e3sconf_aepee2021_02004.pdf |
work_keys_str_mv |
AT chenxiaofang studyonsafetyoperationofmediumvoltagedistributionnetwork AT chenlian studyonsafetyoperationofmediumvoltagedistributionnetwork AT wangdong studyonsafetyoperationofmediumvoltagedistributionnetwork AT chenqihao studyonsafetyoperationofmediumvoltagedistributionnetwork |
_version_ |
1721423420441231360 |