Automated Visual Inspection of Multiple Missing Fastening Bolts on the Sides of High-Speed Train Body in Railway Maintenance
The rapid development of China Railway High-speed (CRH) has provided safe and comfortable transportation for many people. The fastening bolts (FB) on the sides of CRH fall off occasionally, which might cause serious traffic accidents. However, the automatic inspection of multiple missing FBs on the...
Main Authors: | Qinghua Geng, Weiming Liu, Yuan Dai |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2020-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9204633/ |
Similar Items
-
Change Detection: The Framework of Visual Inspection System for Railway Plug Defects
by: Xinyu Du, et al.
Published: (2020-01-01) -
A Novel Image Matching Method Based on SIFT
by: Yuan-Sheng LIN, et al.
Published: (2014-05-01) -
Using Information Content to Select Keypoints for UAV Image Matching
by: Vahid Mousavi, et al.
Published: (2021-03-01) -
Real-Time Inspection System for Ballast Railway Fasteners Based on Point Cloud Deep Learning
by: Hao Cui, et al.
Published: (2020-01-01) -
Geometric- and Optimization-Based Registration Methods for Long-Wave Infrared Hyperspectral Images
by: Alper Koz, et al.
Published: (2021-06-01)