An Exploratory Study on Optimal Iterative Design Schedules with the Consideration of Design Quality and Resource Constraints
The classical dependency structure matrix (DSM) can effectively deal with iterative schedules that are highly coupled and interdependent, such as the design process and the concurrent process. Classical DSM generally follows the assumption that the least iteration occurs to achieve the shortest comp...
Main Authors: | Sou-Sen Leu, Theresia Daisy Nattali Suparman, Cathy Chang-Wei Hung |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-04-01
|
Series: | Sustainability |
Subjects: | |
Online Access: | https://www.mdpi.com/2071-1050/13/8/4584 |
Similar Items
-
Criticality of Schedule Constraints – Classification and Identification for Project Management
by: Qui T. Nguyen, et al.
Published: (2014-01-01) -
Scheduling Project Tasks under Resource Constrained using Design Structure Matrix and Quality Equations
by: Theresia Daisy Nattali Suparman, et al.
Published: (2009) -
Algorithms Using List Scheduling and Greedy Strategies for Scheduling in the Flowshop with Resource Constraints
by: Ewa Figielska
Published: (2014-12-01) -
Scheduling with Space-Time Soft Constraints In Heterogeneous Cloud Datacenters
by: Tumanov, Alexey
Published: (2016) -
Scheduling program based on the theory of constraints
by: Malherbe, Johannes Louw
Published: (2012)