Examining the Dynamics of Novation from the Principal Contractor's and Architect's Perspectives
Design and build is a popular form of procurement worldwide. In its conventional form, it is characterised by the integration between design and construction. Novation, a variant of design and build where design responsibility is transferred from designer to contractor as procurement evolves, has ga...
Main Authors: | Alan Griffith, Andrew King, Andrew Knight |
---|---|
Format: | Article |
Language: | English |
Published: |
UTS ePRESS
2012-11-01
|
Series: | Australasian Journal of Construction Economics and Building |
Online Access: | https://epress.lib.uts.edu.au/journals/index.php/AJCEB/article/view/2907 |
Similar Items
-
Examining the Dynamics of Novation from the Principal Contractor's and Architect's Perspectives
by: Alan Griffith, et al.
Published: (2012-11-01) -
Total quality environmental management (TQEM) framework towards sustainability (UK Novated D&B principal contractors)
by: Khadour, Lina
Published: (2010) -
The Novation in Judicial Recovery
by: Ana Carolina Cunha Brandão, et al.
Published: (2016-11-01) -
STUDY ON THE OBJECTIVE NOVATION OF AN OBLIGATION
by: Ioan Lucian MARINESCU
Published: (2017-05-01) -
Safety analysis of Novat tailings dam
by: Tatu Florian, et al.
Published: (2019-01-01)