Determination of the ball mills performance, taking into account the particle size of the finished product
The article discusses the issue of determining the newly formed specific surface of the cement clinker taking into account the lateral surface of the seal area. When developing this technique, the assumption that the newly formed particles have a shape close to spherical, has been made. The obtained...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/57/e3sconf_catpid2021_01004.pdf |
id |
doaj-fac62ba230874f56bb16c3bb160bb9c8 |
---|---|
record_format |
Article |
spelling |
doaj-fac62ba230874f56bb16c3bb160bb9c82021-07-07T11:35:13ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012810100410.1051/e3sconf/202128101004e3sconf_catpid2021_01004Determination of the ball mills performance, taking into account the particle size of the finished productSharapov RashidThe article discusses the issue of determining the newly formed specific surface of the cement clinker taking into account the lateral surface of the seal area. When developing this technique, the assumption that the newly formed particles have a shape close to spherical, has been made. The obtained ratio determines the work that considers the formation of thecement clinker material new surface, depending on the size of the original and newly formed material. An arithmetic expression is given, defined as the minimum amount of energy that must be introduced into the deformation zone for the destruction of a cement clinker particle to occur. The presented technique is specified taking into account the fact that defects are introduced into the crushed material particle. Taking into account the fact that the grinding ball makes an impact in one cycle of its movement, the value of the newly formed surface of the material in the ball mill is determined in one hour of its operation.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/57/e3sconf_catpid2021_01004.pdf |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Sharapov Rashid |
spellingShingle |
Sharapov Rashid Determination of the ball mills performance, taking into account the particle size of the finished product E3S Web of Conferences |
author_facet |
Sharapov Rashid |
author_sort |
Sharapov Rashid |
title |
Determination of the ball mills performance, taking into account the particle size of the finished product |
title_short |
Determination of the ball mills performance, taking into account the particle size of the finished product |
title_full |
Determination of the ball mills performance, taking into account the particle size of the finished product |
title_fullStr |
Determination of the ball mills performance, taking into account the particle size of the finished product |
title_full_unstemmed |
Determination of the ball mills performance, taking into account the particle size of the finished product |
title_sort |
determination of the ball mills performance, taking into account the particle size of the finished product |
publisher |
EDP Sciences |
series |
E3S Web of Conferences |
issn |
2267-1242 |
publishDate |
2021-01-01 |
description |
The article discusses the issue of determining the newly formed specific surface of the cement clinker taking into account the lateral surface of the seal area. When developing this technique, the assumption that the newly formed particles have a shape close to spherical, has been made. The obtained ratio determines the work that considers the formation of thecement clinker material new surface, depending on the size of the original and newly formed material. An arithmetic expression is given, defined as the minimum amount of energy that must be introduced into the deformation zone for the destruction of a cement clinker particle to occur. The presented technique is specified taking into account the fact that defects are introduced into the crushed material particle. Taking into account the fact that the grinding ball makes an impact in one cycle of its movement, the value of the newly formed surface of the material in the ball mill is determined in one hour of its operation. |
url |
https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/57/e3sconf_catpid2021_01004.pdf |
work_keys_str_mv |
AT sharapovrashid determinationoftheballmillsperformancetakingintoaccounttheparticlesizeofthefinishedproduct |
_version_ |
1721315974313934848 |