Summary: | The article discusses the issue of determining the newly formed specific surface of the cement clinker taking into account the lateral surface of the seal area. When developing this technique, the assumption that the newly formed particles have a shape close to spherical, has been made. The obtained ratio determines the work that considers the formation of thecement clinker material new surface, depending on the size of the original and newly formed material. An arithmetic expression is given, defined as the minimum amount of energy that must be introduced into the deformation zone for the destruction of a cement clinker particle to occur. The presented technique is specified taking into account the fact that defects are introduced into the crushed material particle. Taking into account the fact that the grinding ball makes an impact in one cycle of its movement, the value of the newly formed surface of the material in the ball mill is determined in one hour of its operation.
|